Causes of Construction Projects Delays: a qualitative analysis

Causas de retrasos en proyectos de construcción: un análisis cualitativo

Rudeli, Natalia - Viles, E. - González, J. - Santilli, Adrián
Detalles Bibliográficos
2018
Causas de retrasos
Proyectos de construcción
Gestión de proyectos
Delays Causes
Construction projects
Projects management
Español
Universidad de Montevideo
REDUM
http://revistas.um.edu.uy/index.php/ingenieria/article/view/298
https://hdl.handle.net/20.500.12806/2474
Acceso abierto
Atribución 4.0 Internacional
_version_ 1807356687915417600
author Rudeli, Natalia
author2 Viles, E.
González, J.
Santilli, Adrián
author2_role author
author
author
author_facet Rudeli, Natalia
Viles, E.
González, J.
Santilli, Adrián
author_role author
collection REDUM
dc.creator.none.fl_str_mv Rudeli, Natalia
Viles, E.
González, J.
Santilli, Adrián
dc.date.accessioned.none.fl_str_mv 2024-07-12T12:56:17Z
dc.date.available.none.fl_str_mv 2024-07-12T12:56:17Z
dc.date.none.fl_str_mv 2018-12-03
dc.description.en-US.fl_txt_mv In general, the construction industry tends to be instable and delays are considered one of the main problems that concern the construction projects. Delays can lead to higher costs, disputes, project abandonment and even legal litigation.The main objective of this paper is to carry out a statistical study and a qualitative analysis of the state of the art that allows knowing the main causes of delays in construction projects and their repercussion in the different countries of the world. For this article 1057 causes analyzed by 47 different authors have been studied, detecting that most of the studies have been carried out in Asia and Africa. The main causes of delay in construction projects have been determined using a family classification method. The problems that cause delays in construction projects are: problems during execution, workforce problems, financial issues and design complications. Likewise, the analyzed cases show a great variability in the way of weighing the importance of the causes proposed by the authors. This fact underscores the need to carry out research into new quantitative methods of analysis that will lead to a consensus on what are the most frequent and important causes of delays.
dc.description.es-ES.fl_txt_mv En general la industria de la construcción suele ser inestable y las demoras son consideradas como uno de los mayores problemas que atañan a los proyectos de construcción. Los retrasos en la construcción pueden originar sobre-costos, disputas entre partes, abandono del proyecto e incluso, litigios legales.El objetivo de este artículo es realizar un estudio estadístico y un análisis cualitativo del estado del arte que permita conocer las causas de retrasos más importantes y su repercusión en los distintos países del mundo. Para este artículo han sido estudiadas las 1057 causas analizadas por 47 autores diferentes, detectando que la mayor parte de los estudios han sido llevados a cabo en Asia y África. Un método de clasificación por familias ha sido utilizado, permitiendo determinar a grandes rasgos los principales problemas que llevan al retraso de los proyectos de construcción, de este modo queda evidenciado que los problemas durante la ejecución, problemas con la mano de obra, financieros y de diseño son los principales causantes de los retrasos en los proyectos de construcción. Asimismo, los casos analizados evidencian una gran variabilidad en la manera de ponderar la importancia de las causas propuestas por los autores. Este hecho pone de relieve a la necesidad de realizar una búsqueda de nuevos métodos cuantitativos de análisis que permitan llegar a un consenso sobre cuáles son las causas más frecuentes e importantes de los retrasos.
dc.format.none.fl_str_mv application/pdf
dc.identifier.none.fl_str_mv http://revistas.um.edu.uy/index.php/ingenieria/article/view/298
dc.identifier.uri.none.fl_str_mv https://hdl.handle.net/20.500.12806/2474
dc.language.iso.none.fl_str_mv spa
dc.publisher.es-ES.fl_str_mv Universidad de Montevideo
dc.relation.none.fl_str_mv http://revistas.um.edu.uy/index.php/ingenieria/article/view/298/356
dc.rights.es-ES.fl_str_mv Derechos de autor 2019 N. Rudeli, E. Viles, J. González, Adrián Santilli
dc.rights.license.none.fl_str_mv Atribución 4.0 Internacional
dc.rights.none.fl_str_mv info:eu-repo/semantics/openAccess
dc.source.en-US.fl_str_mv Memoria Investigaciones en Ingeniería; No. 16 (2018); 71-84
dc.source.es-ES.fl_str_mv Memoria Investigaciones en Ingeniería; Núm. 16 (2018); 71-84
dc.source.none.fl_str_mv 2301-1106
2301-1092
reponame:REDUM
instname:Universidad de Montevideo
instacron:Universidad de Montevideo
dc.source.pt-BR.fl_str_mv Memoria Investigaciones en Ingenieria; n. 16 (2018); 71-84
dc.subject.en-US.fl_str_mv Delays Causes
Construction projects
Projects management
dc.subject.es-ES.fl_str_mv Causas de retrasos
Proyectos de construcción
Gestión de proyectos
dc.title.none.fl_str_mv Causes of Construction Projects Delays: a qualitative analysis
Causas de retrasos en proyectos de construcción: un análisis cualitativo
dc.type.en-US.fl_str_mv Peer reviewed articles
dc.type.es-ES.fl_str_mv Artículos evaluados por pares
dc.type.none.fl_str_mv info:eu-repo/semantics/article
info:eu-repo/semantics/publishedVersion
dc.type.pt-BR.fl_str_mv Artigos revistos por pares
dc.type.version.none.fl_str_mv publishedVersion
info:eu-repo/semantics/publishedVersion
description In general, the construction industry tends to be instable and delays are considered one of the main problems that concern the construction projects. Delays can lead to higher costs, disputes, project abandonment and even legal litigation.The main objective of this paper is to carry out a statistical study and a qualitative analysis of the state of the art that allows knowing the main causes of delays in construction projects and their repercussion in the different countries of the world. For this article 1057 causes analyzed by 47 different authors have been studied, detecting that most of the studies have been carried out in Asia and Africa. The main causes of delay in construction projects have been determined using a family classification method. The problems that cause delays in construction projects are: problems during execution, workforce problems, financial issues and design complications. Likewise, the analyzed cases show a great variability in the way of weighing the importance of the causes proposed by the authors. This fact underscores the need to carry out research into new quantitative methods of analysis that will lead to a consensus on what are the most frequent and important causes of delays.
eu_rights_str_mv openAccess
format article
id REDUM_f97cda1a20adfd5aa44b220afa947c34
instacron_str Universidad de Montevideo
institution Universidad de Montevideo
instname_str Universidad de Montevideo
language spa
network_acronym_str REDUM
network_name_str REDUM
oai_identifier_str oai:redum.um.edu.uy:20.500.12806/2474
publishDate 2018
reponame_str REDUM
repository.mail.fl_str_mv nolascoaga@um.edu.uy
repository.name.fl_str_mv REDUM - Universidad de Montevideo
repository_id_str 10501
rights_invalid_str_mv Derechos de autor 2019 N. Rudeli, E. Viles, J. González, Adrián Santilli
Atribución 4.0 Internacional
spelling Rudeli, NataliaViles, E.González, J.Santilli, Adrián2018-12-032024-07-12T12:56:17Z2024-07-12T12:56:17Zhttp://revistas.um.edu.uy/index.php/ingenieria/article/view/298https://hdl.handle.net/20.500.12806/2474In general, the construction industry tends to be instable and delays are considered one of the main problems that concern the construction projects. Delays can lead to higher costs, disputes, project abandonment and even legal litigation.The main objective of this paper is to carry out a statistical study and a qualitative analysis of the state of the art that allows knowing the main causes of delays in construction projects and their repercussion in the different countries of the world. For this article 1057 causes analyzed by 47 different authors have been studied, detecting that most of the studies have been carried out in Asia and Africa. The main causes of delay in construction projects have been determined using a family classification method. The problems that cause delays in construction projects are: problems during execution, workforce problems, financial issues and design complications. Likewise, the analyzed cases show a great variability in the way of weighing the importance of the causes proposed by the authors. This fact underscores the need to carry out research into new quantitative methods of analysis that will lead to a consensus on what are the most frequent and important causes of delays.En general la industria de la construcción suele ser inestable y las demoras son consideradas como uno de los mayores problemas que atañan a los proyectos de construcción. Los retrasos en la construcción pueden originar sobre-costos, disputas entre partes, abandono del proyecto e incluso, litigios legales.El objetivo de este artículo es realizar un estudio estadístico y un análisis cualitativo del estado del arte que permita conocer las causas de retrasos más importantes y su repercusión en los distintos países del mundo. Para este artículo han sido estudiadas las 1057 causas analizadas por 47 autores diferentes, detectando que la mayor parte de los estudios han sido llevados a cabo en Asia y África. Un método de clasificación por familias ha sido utilizado, permitiendo determinar a grandes rasgos los principales problemas que llevan al retraso de los proyectos de construcción, de este modo queda evidenciado que los problemas durante la ejecución, problemas con la mano de obra, financieros y de diseño son los principales causantes de los retrasos en los proyectos de construcción. Asimismo, los casos analizados evidencian una gran variabilidad en la manera de ponderar la importancia de las causas propuestas por los autores. Este hecho pone de relieve a la necesidad de realizar una búsqueda de nuevos métodos cuantitativos de análisis que permitan llegar a un consenso sobre cuáles son las causas más frecuentes e importantes de los retrasos.application/pdfspaUniversidad de Montevideohttp://revistas.um.edu.uy/index.php/ingenieria/article/view/298/356Derechos de autor 2019 N. Rudeli, E. Viles, J. González, Adrián Santilliinfo:eu-repo/semantics/openAccessAtribución 4.0 InternacionalMemoria Investigaciones en Ingeniería; No. 16 (2018); 71-84Memoria Investigaciones en Ingeniería; Núm. 16 (2018); 71-84Memoria Investigaciones en Ingenieria; n. 16 (2018); 71-842301-11062301-1092reponame:REDUMinstname:Universidad de Montevideoinstacron:Universidad de MontevideoCausas de retrasosProyectos de construcciónGestión de proyectosDelays CausesConstruction projectsProjects managementCauses of Construction Projects Delays: a qualitative analysisCausas de retrasos en proyectos de construcción: un análisis cualitativoinfo:eu-repo/semantics/articleinfo:eu-repo/semantics/publishedVersionPeer reviewed articlesArtículos evaluados por paresArtigos revistos por parespublishedVersioninfo:eu-repo/semantics/publishedVersion20.500.12806/24742024-07-12 09:56:17.511oai:redum.um.edu.uy:20.500.12806/2474Universidadhttps://um.edu.uy/https://redum.um.edu.uy/oai/requestnolascoaga@um.edu.uyUruguayopendoar:105012024-07-12T12:56:17REDUM - Universidad de Montevideofalse
spellingShingle Causes of Construction Projects Delays: a qualitative analysis
Rudeli, Natalia
Causas de retrasos
Proyectos de construcción
Gestión de proyectos
Delays Causes
Construction projects
Projects management
status_str publishedVersion
title Causes of Construction Projects Delays: a qualitative analysis
title_full Causes of Construction Projects Delays: a qualitative analysis
title_fullStr Causes of Construction Projects Delays: a qualitative analysis
title_full_unstemmed Causes of Construction Projects Delays: a qualitative analysis
title_short Causes of Construction Projects Delays: a qualitative analysis
title_sort Causes of Construction Projects Delays: a qualitative analysis
topic Causas de retrasos
Proyectos de construcción
Gestión de proyectos
Delays Causes
Construction projects
Projects management
url http://revistas.um.edu.uy/index.php/ingenieria/article/view/298
https://hdl.handle.net/20.500.12806/2474