Causes of Construction Projects Delays: a qualitative analysis
Causas de retrasos en proyectos de construcción: un análisis cualitativo
2018 | |
Causas de retrasos Proyectos de construcción Gestión de proyectos Delays Causes Construction projects Projects management |
|
Español | |
Universidad de Montevideo | |
REDUM | |
http://revistas.um.edu.uy/index.php/ingenieria/article/view/298
https://hdl.handle.net/20.500.12806/2474 |
|
Acceso abierto | |
Atribución 4.0 Internacional |
_version_ | 1807356687915417600 |
---|---|
author | Rudeli, Natalia |
author2 | Viles, E. González, J. Santilli, Adrián |
author2_role | author author author |
author_facet | Rudeli, Natalia Viles, E. González, J. Santilli, Adrián |
author_role | author |
collection | REDUM |
dc.creator.none.fl_str_mv | Rudeli, Natalia Viles, E. González, J. Santilli, Adrián |
dc.date.accessioned.none.fl_str_mv | 2024-07-12T12:56:17Z |
dc.date.available.none.fl_str_mv | 2024-07-12T12:56:17Z |
dc.date.none.fl_str_mv | 2018-12-03 |
dc.description.en-US.fl_txt_mv | In general, the construction industry tends to be instable and delays are considered one of the main problems that concern the construction projects. Delays can lead to higher costs, disputes, project abandonment and even legal litigation.The main objective of this paper is to carry out a statistical study and a qualitative analysis of the state of the art that allows knowing the main causes of delays in construction projects and their repercussion in the different countries of the world. For this article 1057 causes analyzed by 47 different authors have been studied, detecting that most of the studies have been carried out in Asia and Africa. The main causes of delay in construction projects have been determined using a family classification method. The problems that cause delays in construction projects are: problems during execution, workforce problems, financial issues and design complications. Likewise, the analyzed cases show a great variability in the way of weighing the importance of the causes proposed by the authors. This fact underscores the need to carry out research into new quantitative methods of analysis that will lead to a consensus on what are the most frequent and important causes of delays. |
dc.description.es-ES.fl_txt_mv | En general la industria de la construcción suele ser inestable y las demoras son consideradas como uno de los mayores problemas que atañan a los proyectos de construcción. Los retrasos en la construcción pueden originar sobre-costos, disputas entre partes, abandono del proyecto e incluso, litigios legales.El objetivo de este artículo es realizar un estudio estadístico y un análisis cualitativo del estado del arte que permita conocer las causas de retrasos más importantes y su repercusión en los distintos países del mundo. Para este artículo han sido estudiadas las 1057 causas analizadas por 47 autores diferentes, detectando que la mayor parte de los estudios han sido llevados a cabo en Asia y África. Un método de clasificación por familias ha sido utilizado, permitiendo determinar a grandes rasgos los principales problemas que llevan al retraso de los proyectos de construcción, de este modo queda evidenciado que los problemas durante la ejecución, problemas con la mano de obra, financieros y de diseño son los principales causantes de los retrasos en los proyectos de construcción. Asimismo, los casos analizados evidencian una gran variabilidad en la manera de ponderar la importancia de las causas propuestas por los autores. Este hecho pone de relieve a la necesidad de realizar una búsqueda de nuevos métodos cuantitativos de análisis que permitan llegar a un consenso sobre cuáles son las causas más frecuentes e importantes de los retrasos. |
dc.format.none.fl_str_mv | application/pdf |
dc.identifier.none.fl_str_mv | http://revistas.um.edu.uy/index.php/ingenieria/article/view/298 |
dc.identifier.uri.none.fl_str_mv | https://hdl.handle.net/20.500.12806/2474 |
dc.language.iso.none.fl_str_mv | spa |
dc.publisher.es-ES.fl_str_mv | Universidad de Montevideo |
dc.relation.none.fl_str_mv | http://revistas.um.edu.uy/index.php/ingenieria/article/view/298/356 |
dc.rights.es-ES.fl_str_mv | Derechos de autor 2019 N. Rudeli, E. Viles, J. González, Adrián Santilli |
dc.rights.license.none.fl_str_mv | Atribución 4.0 Internacional |
dc.rights.none.fl_str_mv | info:eu-repo/semantics/openAccess |
dc.source.en-US.fl_str_mv | Memoria Investigaciones en Ingeniería; No. 16 (2018); 71-84 |
dc.source.es-ES.fl_str_mv | Memoria Investigaciones en Ingeniería; Núm. 16 (2018); 71-84 |
dc.source.none.fl_str_mv | 2301-1106 2301-1092 reponame:REDUM instname:Universidad de Montevideo instacron:Universidad de Montevideo |
dc.source.pt-BR.fl_str_mv | Memoria Investigaciones en Ingenieria; n. 16 (2018); 71-84 |
dc.subject.en-US.fl_str_mv | Delays Causes Construction projects Projects management |
dc.subject.es-ES.fl_str_mv | Causas de retrasos Proyectos de construcción Gestión de proyectos |
dc.title.none.fl_str_mv | Causes of Construction Projects Delays: a qualitative analysis Causas de retrasos en proyectos de construcción: un análisis cualitativo |
dc.type.en-US.fl_str_mv | Peer reviewed articles |
dc.type.es-ES.fl_str_mv | Artículos evaluados por pares |
dc.type.none.fl_str_mv | info:eu-repo/semantics/article info:eu-repo/semantics/publishedVersion |
dc.type.pt-BR.fl_str_mv | Artigos revistos por pares |
dc.type.version.none.fl_str_mv | publishedVersion info:eu-repo/semantics/publishedVersion |
description | In general, the construction industry tends to be instable and delays are considered one of the main problems that concern the construction projects. Delays can lead to higher costs, disputes, project abandonment and even legal litigation.The main objective of this paper is to carry out a statistical study and a qualitative analysis of the state of the art that allows knowing the main causes of delays in construction projects and their repercussion in the different countries of the world. For this article 1057 causes analyzed by 47 different authors have been studied, detecting that most of the studies have been carried out in Asia and Africa. The main causes of delay in construction projects have been determined using a family classification method. The problems that cause delays in construction projects are: problems during execution, workforce problems, financial issues and design complications. Likewise, the analyzed cases show a great variability in the way of weighing the importance of the causes proposed by the authors. This fact underscores the need to carry out research into new quantitative methods of analysis that will lead to a consensus on what are the most frequent and important causes of delays. |
eu_rights_str_mv | openAccess |
format | article |
id | REDUM_f97cda1a20adfd5aa44b220afa947c34 |
instacron_str | Universidad de Montevideo |
institution | Universidad de Montevideo |
instname_str | Universidad de Montevideo |
language | spa |
network_acronym_str | REDUM |
network_name_str | REDUM |
oai_identifier_str | oai:redum.um.edu.uy:20.500.12806/2474 |
publishDate | 2018 |
reponame_str | REDUM |
repository.mail.fl_str_mv | nolascoaga@um.edu.uy |
repository.name.fl_str_mv | REDUM - Universidad de Montevideo |
repository_id_str | 10501 |
rights_invalid_str_mv | Derechos de autor 2019 N. Rudeli, E. Viles, J. González, Adrián Santilli Atribución 4.0 Internacional |
spelling | Rudeli, NataliaViles, E.González, J.Santilli, Adrián2018-12-032024-07-12T12:56:17Z2024-07-12T12:56:17Zhttp://revistas.um.edu.uy/index.php/ingenieria/article/view/298https://hdl.handle.net/20.500.12806/2474In general, the construction industry tends to be instable and delays are considered one of the main problems that concern the construction projects. Delays can lead to higher costs, disputes, project abandonment and even legal litigation.The main objective of this paper is to carry out a statistical study and a qualitative analysis of the state of the art that allows knowing the main causes of delays in construction projects and their repercussion in the different countries of the world. For this article 1057 causes analyzed by 47 different authors have been studied, detecting that most of the studies have been carried out in Asia and Africa. The main causes of delay in construction projects have been determined using a family classification method. The problems that cause delays in construction projects are: problems during execution, workforce problems, financial issues and design complications. Likewise, the analyzed cases show a great variability in the way of weighing the importance of the causes proposed by the authors. This fact underscores the need to carry out research into new quantitative methods of analysis that will lead to a consensus on what are the most frequent and important causes of delays.En general la industria de la construcción suele ser inestable y las demoras son consideradas como uno de los mayores problemas que atañan a los proyectos de construcción. Los retrasos en la construcción pueden originar sobre-costos, disputas entre partes, abandono del proyecto e incluso, litigios legales.El objetivo de este artículo es realizar un estudio estadístico y un análisis cualitativo del estado del arte que permita conocer las causas de retrasos más importantes y su repercusión en los distintos países del mundo. Para este artículo han sido estudiadas las 1057 causas analizadas por 47 autores diferentes, detectando que la mayor parte de los estudios han sido llevados a cabo en Asia y África. Un método de clasificación por familias ha sido utilizado, permitiendo determinar a grandes rasgos los principales problemas que llevan al retraso de los proyectos de construcción, de este modo queda evidenciado que los problemas durante la ejecución, problemas con la mano de obra, financieros y de diseño son los principales causantes de los retrasos en los proyectos de construcción. Asimismo, los casos analizados evidencian una gran variabilidad en la manera de ponderar la importancia de las causas propuestas por los autores. Este hecho pone de relieve a la necesidad de realizar una búsqueda de nuevos métodos cuantitativos de análisis que permitan llegar a un consenso sobre cuáles son las causas más frecuentes e importantes de los retrasos.application/pdfspaUniversidad de Montevideohttp://revistas.um.edu.uy/index.php/ingenieria/article/view/298/356Derechos de autor 2019 N. Rudeli, E. Viles, J. González, Adrián Santilliinfo:eu-repo/semantics/openAccessAtribución 4.0 InternacionalMemoria Investigaciones en Ingeniería; No. 16 (2018); 71-84Memoria Investigaciones en Ingeniería; Núm. 16 (2018); 71-84Memoria Investigaciones en Ingenieria; n. 16 (2018); 71-842301-11062301-1092reponame:REDUMinstname:Universidad de Montevideoinstacron:Universidad de MontevideoCausas de retrasosProyectos de construcciónGestión de proyectosDelays CausesConstruction projectsProjects managementCauses of Construction Projects Delays: a qualitative analysisCausas de retrasos en proyectos de construcción: un análisis cualitativoinfo:eu-repo/semantics/articleinfo:eu-repo/semantics/publishedVersionPeer reviewed articlesArtículos evaluados por paresArtigos revistos por parespublishedVersioninfo:eu-repo/semantics/publishedVersion20.500.12806/24742024-07-12 09:56:17.511oai:redum.um.edu.uy:20.500.12806/2474Universidadhttps://um.edu.uy/https://redum.um.edu.uy/oai/requestnolascoaga@um.edu.uyUruguayopendoar:105012024-07-12T12:56:17REDUM - Universidad de Montevideofalse |
spellingShingle | Causes of Construction Projects Delays: a qualitative analysis Rudeli, Natalia Causas de retrasos Proyectos de construcción Gestión de proyectos Delays Causes Construction projects Projects management |
status_str | publishedVersion |
title | Causes of Construction Projects Delays: a qualitative analysis |
title_full | Causes of Construction Projects Delays: a qualitative analysis |
title_fullStr | Causes of Construction Projects Delays: a qualitative analysis |
title_full_unstemmed | Causes of Construction Projects Delays: a qualitative analysis |
title_short | Causes of Construction Projects Delays: a qualitative analysis |
title_sort | Causes of Construction Projects Delays: a qualitative analysis |
topic | Causas de retrasos Proyectos de construcción Gestión de proyectos Delays Causes Construction projects Projects management |
url | http://revistas.um.edu.uy/index.php/ingenieria/article/view/298 https://hdl.handle.net/20.500.12806/2474 |