Decision model to determine the return sources, incentives, and capacity in a remanufacturing system

Modelo de decisión para determinar fuentes de retorno, incentivos y capacidad en un sistema de remanufactura

Ruíz-Torres, Alex J. - Jurburg, Daniel - López-Correa, Yarlier
Detalles Bibliográficos
2020
Cadena de suministro
Ciclo cerrado
Logística inversa
Incentivos
Remanufactura
Proveedores
Supply chain management
Closed loop
Reverse logistics
Incentives
Remanufacturing
Suppliers
Español
Universidad de Montevideo
REDUM
http://revistas.um.edu.uy/index.php/ingenieria/article/view/724
Acceso abierto
Atribución 4.0 Internacional
_version_ 1807356687937437696
author Ruíz-Torres, Alex J.
author2 Jurburg, Daniel
López-Correa, Yarlier
author2_role author
author
author_facet Ruíz-Torres, Alex J.
Jurburg, Daniel
López-Correa, Yarlier
author_role author
collection REDUM
dc.creator.none.fl_str_mv Ruíz-Torres, Alex J.
Jurburg, Daniel
López-Correa, Yarlier
dc.date.none.fl_str_mv 2020-12-16
dc.description.en-US.fl_txt_mv This research proposes a decision model to manage the purchase of new and used components in a re-manufacturing system. New components are purchased from a supplier who offers discounts based on the reserved capacity. The used components comes from various sources, where the quantity to be received from each source depends on the incentive provided. The model considers two stochastic elements: the return level per source (for used components) and the possibility that the shipment of new components is not received. A sensitivity analysis is performed based on a numerical example. The results demonstrate significant relationships between the costs to operate the return sources, the probability of low returns, and the incentive levels assigned to each source. The experiments also indicate how the incentives and the reserved capacity depends on the probability that the new components are not received.
dc.description.es-ES.fl_txt_mv Esta investigación propone un modelo de decisión para gestionar la compra de componentes nuevos y usados en un sistema de manufactura. Los componentes nuevos se adquieren de un proveedor el cual ofrece descuentos que dependen de la capacidad reservada. Los componentes usados provienen de varias fuentes, donde la cantidad que se recibirá de cada fuente depende del incentivo suministrado. El modelo considera dos elementos estocásticos, el nivel de retorno por fuente (para componentes usados) y la posibilidad de que no se reciba el envío del proveedor de componentes nuevos. Se realiza un análisis de sensibilidad basándose en un ejemplo numérico. Los resultados demuestran relaciones significativas entre los costos de operación de las fuentes de retorno, la probabilidad de retornos bajos y el número de fuentes usados, y el nivel de incentivo asignado por fuente. Los experimentos también indican como los incentivos y la capacidad reservada dependen de la probabilidad de que no se reciban las unidades nuevas. La aplicación en la práctica del modelo y de los resultados apoyaría a que las empresas con sistemas de remanufactura de componentes seleccionen el mejor nivel de incentivos a ofrecer, determinar su capacidad y decidir cuales fuentes de retornos usar de manera minimicen sus costos totales.
dc.format.none.fl_str_mv application/pdf
application/epub+zip
dc.identifier.none.fl_str_mv http://revistas.um.edu.uy/index.php/ingenieria/article/view/724
10.36561/ING.19.2
dc.language.iso.none.fl_str_mv spa
dc.publisher.es-ES.fl_str_mv Universidad de Montevideo
dc.relation.none.fl_str_mv http://revistas.um.edu.uy/index.php/ingenieria/article/view/724/854
http://revistas.um.edu.uy/index.php/ingenieria/article/view/724/879
dc.rights.es-ES.fl_str_mv Derechos de autor 2020 Alex J. Ruíz-Torres, Daniel Jurburg, Yarlier López-Correa
dc.rights.license.none.fl_str_mv Atribución 4.0 Internacional
dc.rights.none.fl_str_mv info:eu-repo/semantics/openAccess
dc.source.en-US.fl_str_mv Memoria Investigaciones en Ingeniería; No. 19 (2020); 2-24
dc.source.es-ES.fl_str_mv Memoria Investigaciones en Ingeniería; Núm. 19 (2020); 2-24
dc.source.none.fl_str_mv 2301-1106
2301-1092
10.36561/ING.19
reponame:REDUM
instname:Universidad de Montevideo
instacron:Universidad de Montevideo
dc.source.pt-BR.fl_str_mv Memoria Investigaciones en Ingenieria; n. 19 (2020); 2-24
dc.subject.en-US.fl_str_mv Supply chain management
Closed loop
Reverse logistics
Incentives
Remanufacturing
Suppliers
dc.subject.es-ES.fl_str_mv Cadena de suministro
Ciclo cerrado
Logística inversa
Incentivos
Remanufactura
Proveedores
dc.title.none.fl_str_mv Decision model to determine the return sources, incentives, and capacity in a remanufacturing system
Modelo de decisión para determinar fuentes de retorno, incentivos y capacidad en un sistema de remanufactura
dc.type.en-US.fl_str_mv Peer reviewed articles
dc.type.es-ES.fl_str_mv Artículos evaluados por pares
dc.type.none.fl_str_mv info:eu-repo/semantics/article
info:eu-repo/semantics/publishedVersion
dc.type.pt-BR.fl_str_mv Artigos revistos por pares
dc.type.version.none.fl_str_mv publishedVersion
info:eu-repo/semantics/publishedVersion
description This research proposes a decision model to manage the purchase of new and used components in a re-manufacturing system. New components are purchased from a supplier who offers discounts based on the reserved capacity. The used components comes from various sources, where the quantity to be received from each source depends on the incentive provided. The model considers two stochastic elements: the return level per source (for used components) and the possibility that the shipment of new components is not received. A sensitivity analysis is performed based on a numerical example. The results demonstrate significant relationships between the costs to operate the return sources, the probability of low returns, and the incentive levels assigned to each source. The experiments also indicate how the incentives and the reserved capacity depends on the probability that the new components are not received.
eu_rights_str_mv openAccess
format article
id REDUM_efe47352c585384a1b95214427ce9687
identifier_str_mv 10.36561/ING.19.2
instacron_str Universidad de Montevideo
institution Universidad de Montevideo
instname_str Universidad de Montevideo
language spa
network_acronym_str REDUM
network_name_str REDUM
oai_identifier_str oai:redum.um.edu.uy:20.500.12806/2542
publishDate 2020
reponame_str REDUM
repository.mail.fl_str_mv nolascoaga@um.edu.uy
repository.name.fl_str_mv REDUM - Universidad de Montevideo
repository_id_str 10501
rights_invalid_str_mv Derechos de autor 2020 Alex J. Ruíz-Torres, Daniel Jurburg, Yarlier López-Correa
Atribución 4.0 Internacional
spelling Ruíz-Torres, Alex J.Jurburg, DanielLópez-Correa, Yarlier2020-12-16http://revistas.um.edu.uy/index.php/ingenieria/article/view/72410.36561/ING.19.2This research proposes a decision model to manage the purchase of new and used components in a re-manufacturing system. New components are purchased from a supplier who offers discounts based on the reserved capacity. The used components comes from various sources, where the quantity to be received from each source depends on the incentive provided. The model considers two stochastic elements: the return level per source (for used components) and the possibility that the shipment of new components is not received. A sensitivity analysis is performed based on a numerical example. The results demonstrate significant relationships between the costs to operate the return sources, the probability of low returns, and the incentive levels assigned to each source. The experiments also indicate how the incentives and the reserved capacity depends on the probability that the new components are not received.Esta investigación propone un modelo de decisión para gestionar la compra de componentes nuevos y usados en un sistema de manufactura. Los componentes nuevos se adquieren de un proveedor el cual ofrece descuentos que dependen de la capacidad reservada. Los componentes usados provienen de varias fuentes, donde la cantidad que se recibirá de cada fuente depende del incentivo suministrado. El modelo considera dos elementos estocásticos, el nivel de retorno por fuente (para componentes usados) y la posibilidad de que no se reciba el envío del proveedor de componentes nuevos. Se realiza un análisis de sensibilidad basándose en un ejemplo numérico. Los resultados demuestran relaciones significativas entre los costos de operación de las fuentes de retorno, la probabilidad de retornos bajos y el número de fuentes usados, y el nivel de incentivo asignado por fuente. Los experimentos también indican como los incentivos y la capacidad reservada dependen de la probabilidad de que no se reciban las unidades nuevas. La aplicación en la práctica del modelo y de los resultados apoyaría a que las empresas con sistemas de remanufactura de componentes seleccionen el mejor nivel de incentivos a ofrecer, determinar su capacidad y decidir cuales fuentes de retornos usar de manera minimicen sus costos totales.application/pdfapplication/epub+zipspaUniversidad de Montevideohttp://revistas.um.edu.uy/index.php/ingenieria/article/view/724/854http://revistas.um.edu.uy/index.php/ingenieria/article/view/724/879Derechos de autor 2020 Alex J. Ruíz-Torres, Daniel Jurburg, Yarlier López-Correainfo:eu-repo/semantics/openAccessAtribución 4.0 InternacionalMemoria Investigaciones en Ingeniería; No. 19 (2020); 2-24Memoria Investigaciones en Ingeniería; Núm. 19 (2020); 2-24Memoria Investigaciones en Ingenieria; n. 19 (2020); 2-242301-11062301-109210.36561/ING.19reponame:REDUMinstname:Universidad de Montevideoinstacron:Universidad de MontevideoCadena de suministroCiclo cerradoLogística inversaIncentivosRemanufacturaProveedoresSupply chain managementClosed loopReverse logisticsIncentivesRemanufacturingSuppliersDecision model to determine the return sources, incentives, and capacity in a remanufacturing systemModelo de decisión para determinar fuentes de retorno, incentivos y capacidad en un sistema de remanufacturainfo:eu-repo/semantics/articleinfo:eu-repo/semantics/publishedVersionPeer reviewed articlesArtículos evaluados por paresArtigos revistos por parespublishedVersioninfo:eu-repo/semantics/publishedVersion20.500.12806/25422024-07-17 09:46:41.81oai:redum.um.edu.uy:20.500.12806/2542Universidadhttps://um.edu.uy/https://redum.um.edu.uy/oai/requestnolascoaga@um.edu.uyUruguayopendoar:105012024-07-17T12:46:41REDUM - Universidad de Montevideofalse
spellingShingle Decision model to determine the return sources, incentives, and capacity in a remanufacturing system
Ruíz-Torres, Alex J.
Cadena de suministro
Ciclo cerrado
Logística inversa
Incentivos
Remanufactura
Proveedores
Supply chain management
Closed loop
Reverse logistics
Incentives
Remanufacturing
Suppliers
status_str publishedVersion
title Decision model to determine the return sources, incentives, and capacity in a remanufacturing system
title_full Decision model to determine the return sources, incentives, and capacity in a remanufacturing system
title_fullStr Decision model to determine the return sources, incentives, and capacity in a remanufacturing system
title_full_unstemmed Decision model to determine the return sources, incentives, and capacity in a remanufacturing system
title_short Decision model to determine the return sources, incentives, and capacity in a remanufacturing system
title_sort Decision model to determine the return sources, incentives, and capacity in a remanufacturing system
topic Cadena de suministro
Ciclo cerrado
Logística inversa
Incentivos
Remanufactura
Proveedores
Supply chain management
Closed loop
Reverse logistics
Incentives
Remanufacturing
Suppliers
url http://revistas.um.edu.uy/index.php/ingenieria/article/view/724