Planning of the ventilation system and long-term 3D design with the 3D ventsim software, case Santander – Glencore Mine
Planificación del sistema de ventilación y diseño 3D a largo plazo con el software 3D ventsim, caso Mina Santander – Glencore
Planejamento do sistema de ventilação e projeto 3D de longo prazo com o software 3D ventsim, caso Mina Santander – Glencore
2023 | |
Software 3D Ventsim Planificación Largo plazo Mina Santander – Glencore Ventsim 3D software Planning Long term Santander – Glencore Mine Software 3D Ventsim Planejamento Longo prazo Santander Mine – Glencore |
|
Español | |
Universidad de Montevideo | |
REDUM | |
http://revistas.um.edu.uy/index.php/ingenieria/article/view/1140 | |
Acceso abierto | |
Atribución 4.0 Internacional |
_version_ | 1807356688956653568 |
---|---|
author | Ponce Estrada, Víctor A. |
author2 | Huaraya Manzano, Elvis J. |
author2_role | author |
author_facet | Ponce Estrada, Víctor A. Huaraya Manzano, Elvis J. |
author_role | author |
collection | REDUM |
dc.creator.none.fl_str_mv | Ponce Estrada, Víctor A. Huaraya Manzano, Elvis J. |
dc.date.none.fl_str_mv | 2023-06-28 |
dc.description.en-US.fl_txt_mv | In the country, one of the biggest challenges of underground mining is the supply of the air flow required in the work fronts according to D.S. 023-2016-EM and its amendment D.S. 024-2017-EM. In the Santander mining unit, Glencore, ventilation is forced due to the depression exerted by the three main fans, 100k cfm, 160 cfm and 120k cfm; located on the surface of the mine. The clean air requirement at this mining unit is 421,940 cfm, but the clean air inlet is 431,145 cfm and the outlet is 432,531 cfm, implying 102% coverage. In order to temporarily meet the projected long-term air requirement, medium-term planning is carried out; To solve this planning deficiency, the 3D Ventsim software is applied, which, calibrated at 90%, simulates the simulation of the ventilation system in reliable scenarios. In conclusion, the planning of a ventilation system with the Ventsim design program allows to comply with the required air in the long term and to carry out a detailed evaluation of the behavior of the ventilation system in the long term. |
dc.description.es-ES.fl_txt_mv | En el país, uno de los mayores retos de la minería subterránea es el abastecimiento del flujo de aire requerido en los frentes de trabajo de acuerdo con el D.S. 024-2016-EM y su modificatoria D.S. 023-2017-EM. En la unidad minera Santander, Glencore, la ventilación es forzada debido a la depresión que ejercen los tres ventiladores principales, 100k cfm, 160 cfm y 120k cfm; ubicados en la superficie de la mina. El requerimiento de aire limpio en esta unidad minera es de 421,940 cfm, pero el ingreso de aire limpio es de 431,145 cfm y la salida es de 432,531 cfm, implicando una cobertura de 102%. Para cumplir, de manera transitoria, con el requerimiento de aire proyectado a largo plazo se realiza una planificación a mediano plazo; para solventar esta deficiencia de planificación, se aplica el software 3D Ventsim que calibrado al 90% la simulación del sistema de ventilación simula escenarios confiables. En conclusión, la planificación de un sistema de ventilación con el programa de diseño Ventsim permite cumplir con el aire requerido a largo plazo y realizar una evaluación detallada del comportamiento del sistema de ventilación a largo plazo. |
dc.description.pt-BR.fl_txt_mv | No país, um dos maiores desafios da mineração subterrânea é o suprimento da vazão de ar necessária nas frentes de trabalho conforme D.S. 024-2016-EM e sua alteração D.S. 023-2017-EM. Na unidade de mineração do Santander, Glencore, a ventilação é forçada devido à depressão exercida pelos três ventiladores principais, 100k cfm, 160 cfm e 120k cfm; localizado na superfície da mina. A necessidade de ar limpo nesta unidade de mineração é de 421.940 cfm, mas a entrada de ar limpo é de 431.145 cfm e a saída é de 432.531 cfm, o que implica 102% de cobertura. Para atender temporariamente à necessidade de ar projetada a longo prazo, é realizado um planejamento de médio prazo; Para solucionar essa deficiência de planejamento, é aplicado o software 3D VentSim que, calibrado a 90%, simula o sistema de ventilação em cenários confiáveis. Em conclusão, o planejamento de um sistema de ventilação com o programa de projeto Ventsim permite atender o ar necessário a longo prazo e realizar uma avaliação detalhada do comportamento do sistema de ventilação a longo prazo. |
dc.format.none.fl_str_mv | application/pdf text/html |
dc.identifier.none.fl_str_mv | http://revistas.um.edu.uy/index.php/ingenieria/article/view/1140 10.36561/ING.24.2 |
dc.language.iso.none.fl_str_mv | spa |
dc.publisher.es-ES.fl_str_mv | Universidad de Montevideo |
dc.relation.none.fl_str_mv | http://revistas.um.edu.uy/index.php/ingenieria/article/view/1140/1448 http://revistas.um.edu.uy/index.php/ingenieria/article/view/1140/1451 |
dc.rights.es-ES.fl_str_mv | Derechos de autor 2023 Víctor A. Ponce Estrada, Elvis J. Huaraya Manzano |
dc.rights.license.none.fl_str_mv | Atribución 4.0 Internacional |
dc.rights.none.fl_str_mv | info:eu-repo/semantics/openAccess |
dc.source.en-US.fl_str_mv | Memoria Investigaciones en Ingeniería; No. 24 (2023); 2-12 |
dc.source.es-ES.fl_str_mv | Memoria Investigaciones en Ingeniería; Núm. 24 (2023); 2-12 |
dc.source.none.fl_str_mv | 2301-1106 2301-1092 10.36561/ING.24 reponame:REDUM instname:Universidad de Montevideo instacron:Universidad de Montevideo |
dc.source.pt-BR.fl_str_mv | Memoria Investigaciones en Ingenieria; n. 24 (2023); 2-12 |
dc.subject.en-US.fl_str_mv | Ventsim 3D software Planning Long term Santander – Glencore Mine |
dc.subject.es-ES.fl_str_mv | Software 3D Ventsim Planificación Largo plazo Mina Santander – Glencore |
dc.subject.pt-BR.fl_str_mv | Software 3D Ventsim Planejamento Longo prazo Santander Mine – Glencore |
dc.title.none.fl_str_mv | Planning of the ventilation system and long-term 3D design with the 3D ventsim software, case Santander – Glencore Mine Planificación del sistema de ventilación y diseño 3D a largo plazo con el software 3D ventsim, caso Mina Santander – Glencore Planejamento do sistema de ventilação e projeto 3D de longo prazo com o software 3D ventsim, caso Mina Santander – Glencore |
dc.type.en-US.fl_str_mv | Peer reviewed articles |
dc.type.es-ES.fl_str_mv | Artículos evaluados por pares |
dc.type.none.fl_str_mv | info:eu-repo/semantics/article info:eu-repo/semantics/publishedVersion |
dc.type.pt-BR.fl_str_mv | Artigos revistos por pares |
dc.type.version.none.fl_str_mv | publishedVersion info:eu-repo/semantics/publishedVersion |
description | In the country, one of the biggest challenges of underground mining is the supply of the air flow required in the work fronts according to D.S. 023-2016-EM and its amendment D.S. 024-2017-EM. In the Santander mining unit, Glencore, ventilation is forced due to the depression exerted by the three main fans, 100k cfm, 160 cfm and 120k cfm; located on the surface of the mine. The clean air requirement at this mining unit is 421,940 cfm, but the clean air inlet is 431,145 cfm and the outlet is 432,531 cfm, implying 102% coverage. In order to temporarily meet the projected long-term air requirement, medium-term planning is carried out; To solve this planning deficiency, the 3D Ventsim software is applied, which, calibrated at 90%, simulates the simulation of the ventilation system in reliable scenarios. In conclusion, the planning of a ventilation system with the Ventsim design program allows to comply with the required air in the long term and to carry out a detailed evaluation of the behavior of the ventilation system in the long term. |
eu_rights_str_mv | openAccess |
format | article |
id | REDUM_d37289b644608477c04b5a85c824b93d |
identifier_str_mv | 10.36561/ING.24.2 |
instacron_str | Universidad de Montevideo |
institution | Universidad de Montevideo |
instname_str | Universidad de Montevideo |
language | spa |
network_acronym_str | REDUM |
network_name_str | REDUM |
oai_identifier_str | oai:redum.um.edu.uy:20.500.12806/2579 |
publishDate | 2023 |
reponame_str | REDUM |
repository.mail.fl_str_mv | nolascoaga@um.edu.uy |
repository.name.fl_str_mv | REDUM - Universidad de Montevideo |
repository_id_str | 10501 |
rights_invalid_str_mv | Derechos de autor 2023 Víctor A. Ponce Estrada, Elvis J. Huaraya Manzano Atribución 4.0 Internacional |
spelling | Ponce Estrada, Víctor A.Huaraya Manzano, Elvis J.2023-06-28http://revistas.um.edu.uy/index.php/ingenieria/article/view/114010.36561/ING.24.2In the country, one of the biggest challenges of underground mining is the supply of the air flow required in the work fronts according to D.S. 023-2016-EM and its amendment D.S. 024-2017-EM. In the Santander mining unit, Glencore, ventilation is forced due to the depression exerted by the three main fans, 100k cfm, 160 cfm and 120k cfm; located on the surface of the mine. The clean air requirement at this mining unit is 421,940 cfm, but the clean air inlet is 431,145 cfm and the outlet is 432,531 cfm, implying 102% coverage. In order to temporarily meet the projected long-term air requirement, medium-term planning is carried out; To solve this planning deficiency, the 3D Ventsim software is applied, which, calibrated at 90%, simulates the simulation of the ventilation system in reliable scenarios. In conclusion, the planning of a ventilation system with the Ventsim design program allows to comply with the required air in the long term and to carry out a detailed evaluation of the behavior of the ventilation system in the long term.En el país, uno de los mayores retos de la minería subterránea es el abastecimiento del flujo de aire requerido en los frentes de trabajo de acuerdo con el D.S. 024-2016-EM y su modificatoria D.S. 023-2017-EM. En la unidad minera Santander, Glencore, la ventilación es forzada debido a la depresión que ejercen los tres ventiladores principales, 100k cfm, 160 cfm y 120k cfm; ubicados en la superficie de la mina. El requerimiento de aire limpio en esta unidad minera es de 421,940 cfm, pero el ingreso de aire limpio es de 431,145 cfm y la salida es de 432,531 cfm, implicando una cobertura de 102%. Para cumplir, de manera transitoria, con el requerimiento de aire proyectado a largo plazo se realiza una planificación a mediano plazo; para solventar esta deficiencia de planificación, se aplica el software 3D Ventsim que calibrado al 90% la simulación del sistema de ventilación simula escenarios confiables. En conclusión, la planificación de un sistema de ventilación con el programa de diseño Ventsim permite cumplir con el aire requerido a largo plazo y realizar una evaluación detallada del comportamiento del sistema de ventilación a largo plazo.No país, um dos maiores desafios da mineração subterrânea é o suprimento da vazão de ar necessária nas frentes de trabalho conforme D.S. 024-2016-EM e sua alteração D.S. 023-2017-EM. Na unidade de mineração do Santander, Glencore, a ventilação é forçada devido à depressão exercida pelos três ventiladores principais, 100k cfm, 160 cfm e 120k cfm; localizado na superfície da mina. A necessidade de ar limpo nesta unidade de mineração é de 421.940 cfm, mas a entrada de ar limpo é de 431.145 cfm e a saída é de 432.531 cfm, o que implica 102% de cobertura. Para atender temporariamente à necessidade de ar projetada a longo prazo, é realizado um planejamento de médio prazo; Para solucionar essa deficiência de planejamento, é aplicado o software 3D VentSim que, calibrado a 90%, simula o sistema de ventilação em cenários confiáveis. Em conclusão, o planejamento de um sistema de ventilação com o programa de projeto Ventsim permite atender o ar necessário a longo prazo e realizar uma avaliação detalhada do comportamento do sistema de ventilação a longo prazo.application/pdftext/htmlspaUniversidad de Montevideohttp://revistas.um.edu.uy/index.php/ingenieria/article/view/1140/1448http://revistas.um.edu.uy/index.php/ingenieria/article/view/1140/1451Derechos de autor 2023 Víctor A. Ponce Estrada, Elvis J. Huaraya Manzanoinfo:eu-repo/semantics/openAccessAtribución 4.0 InternacionalMemoria Investigaciones en Ingeniería; No. 24 (2023); 2-12Memoria Investigaciones en Ingeniería; Núm. 24 (2023); 2-12Memoria Investigaciones en Ingenieria; n. 24 (2023); 2-122301-11062301-109210.36561/ING.24reponame:REDUMinstname:Universidad de Montevideoinstacron:Universidad de MontevideoSoftware 3D VentsimPlanificaciónLargo plazoMina Santander – GlencoreVentsim 3D softwarePlanningLong termSantander – Glencore MineSoftware 3D VentsimPlanejamentoLongo prazoSantander Mine – GlencorePlanning of the ventilation system and long-term 3D design with the 3D ventsim software, case Santander – Glencore MinePlanificación del sistema de ventilación y diseño 3D a largo plazo con el software 3D ventsim, caso Mina Santander – GlencorePlanejamento do sistema de ventilação e projeto 3D de longo prazo com o software 3D ventsim, caso Mina Santander – Glencoreinfo:eu-repo/semantics/articleinfo:eu-repo/semantics/publishedVersionPeer reviewed articlesArtículos evaluados por paresArtigos revistos por parespublishedVersioninfo:eu-repo/semantics/publishedVersion20.500.12806/25792024-07-17 09:46:46.913oai:redum.um.edu.uy:20.500.12806/2579Universidadhttps://um.edu.uy/https://redum.um.edu.uy/oai/requestnolascoaga@um.edu.uyUruguayopendoar:105012024-07-17T12:46:46REDUM - Universidad de Montevideofalse |
spellingShingle | Planning of the ventilation system and long-term 3D design with the 3D ventsim software, case Santander – Glencore Mine Ponce Estrada, Víctor A. Software 3D Ventsim Planificación Largo plazo Mina Santander – Glencore Ventsim 3D software Planning Long term Santander – Glencore Mine Software 3D Ventsim Planejamento Longo prazo Santander Mine – Glencore |
status_str | publishedVersion |
title | Planning of the ventilation system and long-term 3D design with the 3D ventsim software, case Santander – Glencore Mine |
title_full | Planning of the ventilation system and long-term 3D design with the 3D ventsim software, case Santander – Glencore Mine |
title_fullStr | Planning of the ventilation system and long-term 3D design with the 3D ventsim software, case Santander – Glencore Mine |
title_full_unstemmed | Planning of the ventilation system and long-term 3D design with the 3D ventsim software, case Santander – Glencore Mine |
title_short | Planning of the ventilation system and long-term 3D design with the 3D ventsim software, case Santander – Glencore Mine |
title_sort | Planning of the ventilation system and long-term 3D design with the 3D ventsim software, case Santander – Glencore Mine |
topic | Software 3D Ventsim Planificación Largo plazo Mina Santander – Glencore Ventsim 3D software Planning Long term Santander – Glencore Mine Software 3D Ventsim Planejamento Longo prazo Santander Mine – Glencore |
url | http://revistas.um.edu.uy/index.php/ingenieria/article/view/1140 |