Planning of the ventilation system and long-term 3D design with the 3D ventsim software, case Santander – Glencore Mine

Planificación del sistema de ventilación y diseño 3D a largo plazo con el software 3D ventsim, caso Mina Santander – Glencore

Planejamento do sistema de ventilação e projeto 3D de longo prazo com o software 3D ventsim, caso Mina Santander – Glencore

Ponce Estrada, Víctor A. - Huaraya Manzano, Elvis J.
Detalles Bibliográficos
2023
Software 3D Ventsim
Planificación
Largo plazo
Mina Santander – Glencore
Ventsim 3D software
Planning
Long term
Santander – Glencore Mine
Software 3D Ventsim
Planejamento
Longo prazo
Santander Mine – Glencore
Español
Universidad de Montevideo
REDUM
http://revistas.um.edu.uy/index.php/ingenieria/article/view/1140
Acceso abierto
Atribución 4.0 Internacional
_version_ 1807356688956653568
author Ponce Estrada, Víctor A.
author2 Huaraya Manzano, Elvis J.
author2_role author
author_facet Ponce Estrada, Víctor A.
Huaraya Manzano, Elvis J.
author_role author
collection REDUM
dc.creator.none.fl_str_mv Ponce Estrada, Víctor A.
Huaraya Manzano, Elvis J.
dc.date.none.fl_str_mv 2023-06-28
dc.description.en-US.fl_txt_mv In the country, one of the biggest challenges of underground mining is the supply of the air flow required in the work fronts according to D.S. 023-2016-EM and its amendment D.S. 024-2017-EM. In the Santander mining unit, Glencore, ventilation is forced due to the depression exerted by the three main fans, 100k cfm, 160 cfm and 120k cfm; located on the surface of the mine. The clean air requirement at this mining unit is 421,940 cfm, but the clean air inlet is 431,145 cfm and the outlet is 432,531 cfm, implying 102% coverage. In order to temporarily meet the projected long-term air requirement, medium-term planning is carried out; To solve this planning deficiency, the 3D Ventsim software is applied, which, calibrated at 90%, simulates the simulation of the ventilation system in reliable scenarios. In conclusion, the planning of a ventilation system with the Ventsim design program allows to comply with the required air in the long term and to carry out a detailed evaluation of the behavior of the ventilation system in the long term.
dc.description.es-ES.fl_txt_mv En el país, uno de los mayores retos de la minería subterránea es el abastecimiento del flujo de aire requerido en los frentes de trabajo de acuerdo con el D.S. 024-2016-EM y su modificatoria D.S. 023-2017-EM. En la unidad minera Santander, Glencore, la ventilación es forzada debido a la depresión que ejercen los tres ventiladores principales, 100k cfm, 160 cfm y 120k cfm; ubicados en la superficie de la mina. El requerimiento de aire limpio en esta unidad minera es de 421,940 cfm, pero el ingreso de aire limpio es de 431,145 cfm y la salida es de 432,531 cfm, implicando una cobertura de 102%. Para cumplir, de manera transitoria, con el requerimiento de aire proyectado a largo plazo se realiza una planificación a mediano plazo; para solventar esta deficiencia de planificación, se aplica el software 3D Ventsim que calibrado al 90% la simulación del sistema de ventilación simula escenarios confiables. En conclusión, la planificación de un sistema de ventilación con el programa de diseño Ventsim permite cumplir con el aire requerido a largo plazo y realizar una evaluación detallada del comportamiento del sistema de ventilación a largo plazo.
dc.description.pt-BR.fl_txt_mv No país, um dos maiores desafios da mineração subterrânea é o suprimento da vazão de ar necessária nas frentes de trabalho conforme D.S. 024-2016-EM e sua alteração D.S. 023-2017-EM. Na unidade de mineração do Santander, Glencore, a ventilação é forçada devido à depressão exercida pelos três ventiladores principais, 100k cfm, 160 cfm e 120k cfm; localizado na superfície da mina. A necessidade de ar limpo nesta unidade de mineração é de 421.940 cfm, mas a entrada de ar limpo é de 431.145 cfm e a saída é de 432.531 cfm, o que implica 102% de cobertura. Para atender temporariamente à necessidade de ar projetada a longo prazo, é realizado um planejamento de médio prazo; Para solucionar essa deficiência de planejamento, é aplicado o software 3D VentSim que, calibrado a 90%, simula o sistema de ventilação em cenários confiáveis. Em conclusão, o planejamento de um sistema de ventilação com o programa de projeto Ventsim permite atender o ar necessário a longo prazo e realizar uma avaliação detalhada do comportamento do sistema de ventilação a longo prazo.
dc.format.none.fl_str_mv application/pdf
text/html
dc.identifier.none.fl_str_mv http://revistas.um.edu.uy/index.php/ingenieria/article/view/1140
10.36561/ING.24.2
dc.language.iso.none.fl_str_mv spa
dc.publisher.es-ES.fl_str_mv Universidad de Montevideo
dc.relation.none.fl_str_mv http://revistas.um.edu.uy/index.php/ingenieria/article/view/1140/1448
http://revistas.um.edu.uy/index.php/ingenieria/article/view/1140/1451
dc.rights.es-ES.fl_str_mv Derechos de autor 2023 Víctor A. Ponce Estrada, Elvis J. Huaraya Manzano
dc.rights.license.none.fl_str_mv Atribución 4.0 Internacional
dc.rights.none.fl_str_mv info:eu-repo/semantics/openAccess
dc.source.en-US.fl_str_mv Memoria Investigaciones en Ingeniería; No. 24 (2023); 2-12
dc.source.es-ES.fl_str_mv Memoria Investigaciones en Ingeniería; Núm. 24 (2023); 2-12
dc.source.none.fl_str_mv 2301-1106
2301-1092
10.36561/ING.24
reponame:REDUM
instname:Universidad de Montevideo
instacron:Universidad de Montevideo
dc.source.pt-BR.fl_str_mv Memoria Investigaciones en Ingenieria; n. 24 (2023); 2-12
dc.subject.en-US.fl_str_mv Ventsim 3D software
Planning
Long term
Santander – Glencore Mine
dc.subject.es-ES.fl_str_mv Software 3D Ventsim
Planificación
Largo plazo
Mina Santander – Glencore
dc.subject.pt-BR.fl_str_mv Software 3D Ventsim
Planejamento
Longo prazo
Santander Mine – Glencore
dc.title.none.fl_str_mv Planning of the ventilation system and long-term 3D design with the 3D ventsim software, case Santander – Glencore Mine
Planificación del sistema de ventilación y diseño 3D a largo plazo con el software 3D ventsim, caso Mina Santander – Glencore
Planejamento do sistema de ventilação e projeto 3D de longo prazo com o software 3D ventsim, caso Mina Santander – Glencore
dc.type.en-US.fl_str_mv Peer reviewed articles
dc.type.es-ES.fl_str_mv Artículos evaluados por pares
dc.type.none.fl_str_mv info:eu-repo/semantics/article
info:eu-repo/semantics/publishedVersion
dc.type.pt-BR.fl_str_mv Artigos revistos por pares
dc.type.version.none.fl_str_mv publishedVersion
info:eu-repo/semantics/publishedVersion
description In the country, one of the biggest challenges of underground mining is the supply of the air flow required in the work fronts according to D.S. 023-2016-EM and its amendment D.S. 024-2017-EM. In the Santander mining unit, Glencore, ventilation is forced due to the depression exerted by the three main fans, 100k cfm, 160 cfm and 120k cfm; located on the surface of the mine. The clean air requirement at this mining unit is 421,940 cfm, but the clean air inlet is 431,145 cfm and the outlet is 432,531 cfm, implying 102% coverage. In order to temporarily meet the projected long-term air requirement, medium-term planning is carried out; To solve this planning deficiency, the 3D Ventsim software is applied, which, calibrated at 90%, simulates the simulation of the ventilation system in reliable scenarios. In conclusion, the planning of a ventilation system with the Ventsim design program allows to comply with the required air in the long term and to carry out a detailed evaluation of the behavior of the ventilation system in the long term.
eu_rights_str_mv openAccess
format article
id REDUM_d37289b644608477c04b5a85c824b93d
identifier_str_mv 10.36561/ING.24.2
instacron_str Universidad de Montevideo
institution Universidad de Montevideo
instname_str Universidad de Montevideo
language spa
network_acronym_str REDUM
network_name_str REDUM
oai_identifier_str oai:redum.um.edu.uy:20.500.12806/2579
publishDate 2023
reponame_str REDUM
repository.mail.fl_str_mv nolascoaga@um.edu.uy
repository.name.fl_str_mv REDUM - Universidad de Montevideo
repository_id_str 10501
rights_invalid_str_mv Derechos de autor 2023 Víctor A. Ponce Estrada, Elvis J. Huaraya Manzano
Atribución 4.0 Internacional
spelling Ponce Estrada, Víctor A.Huaraya Manzano, Elvis J.2023-06-28http://revistas.um.edu.uy/index.php/ingenieria/article/view/114010.36561/ING.24.2In the country, one of the biggest challenges of underground mining is the supply of the air flow required in the work fronts according to D.S. 023-2016-EM and its amendment D.S. 024-2017-EM. In the Santander mining unit, Glencore, ventilation is forced due to the depression exerted by the three main fans, 100k cfm, 160 cfm and 120k cfm; located on the surface of the mine. The clean air requirement at this mining unit is 421,940 cfm, but the clean air inlet is 431,145 cfm and the outlet is 432,531 cfm, implying 102% coverage. In order to temporarily meet the projected long-term air requirement, medium-term planning is carried out; To solve this planning deficiency, the 3D Ventsim software is applied, which, calibrated at 90%, simulates the simulation of the ventilation system in reliable scenarios. In conclusion, the planning of a ventilation system with the Ventsim design program allows to comply with the required air in the long term and to carry out a detailed evaluation of the behavior of the ventilation system in the long term.En el país, uno de los mayores retos de la minería subterránea es el abastecimiento del flujo de aire requerido en los frentes de trabajo de acuerdo con el D.S. 024-2016-EM y su modificatoria D.S. 023-2017-EM. En la unidad minera Santander, Glencore, la ventilación es forzada debido a la depresión que ejercen los tres ventiladores principales, 100k cfm, 160 cfm y 120k cfm; ubicados en la superficie de la mina. El requerimiento de aire limpio en esta unidad minera es de 421,940 cfm, pero el ingreso de aire limpio es de 431,145 cfm y la salida es de 432,531 cfm, implicando una cobertura de 102%. Para cumplir, de manera transitoria, con el requerimiento de aire proyectado a largo plazo se realiza una planificación a mediano plazo; para solventar esta deficiencia de planificación, se aplica el software 3D Ventsim que calibrado al 90% la simulación del sistema de ventilación simula escenarios confiables. En conclusión, la planificación de un sistema de ventilación con el programa de diseño Ventsim permite cumplir con el aire requerido a largo plazo y realizar una evaluación detallada del comportamiento del sistema de ventilación a largo plazo.No país, um dos maiores desafios da mineração subterrânea é o suprimento da vazão de ar necessária nas frentes de trabalho conforme D.S. 024-2016-EM e sua alteração D.S. 023-2017-EM. Na unidade de mineração do Santander, Glencore, a ventilação é forçada devido à depressão exercida pelos três ventiladores principais, 100k cfm, 160 cfm e 120k cfm; localizado na superfície da mina. A necessidade de ar limpo nesta unidade de mineração é de 421.940 cfm, mas a entrada de ar limpo é de 431.145 cfm e a saída é de 432.531 cfm, o que implica 102% de cobertura. Para atender temporariamente à necessidade de ar projetada a longo prazo, é realizado um planejamento de médio prazo; Para solucionar essa deficiência de planejamento, é aplicado o software 3D VentSim que, calibrado a 90%, simula o sistema de ventilação em cenários confiáveis. Em conclusão, o planejamento de um sistema de ventilação com o programa de projeto Ventsim permite atender o ar necessário a longo prazo e realizar uma avaliação detalhada do comportamento do sistema de ventilação a longo prazo.application/pdftext/htmlspaUniversidad de Montevideohttp://revistas.um.edu.uy/index.php/ingenieria/article/view/1140/1448http://revistas.um.edu.uy/index.php/ingenieria/article/view/1140/1451Derechos de autor 2023 Víctor A. Ponce Estrada, Elvis J. Huaraya Manzanoinfo:eu-repo/semantics/openAccessAtribución 4.0 InternacionalMemoria Investigaciones en Ingeniería; No. 24 (2023); 2-12Memoria Investigaciones en Ingeniería; Núm. 24 (2023); 2-12Memoria Investigaciones en Ingenieria; n. 24 (2023); 2-122301-11062301-109210.36561/ING.24reponame:REDUMinstname:Universidad de Montevideoinstacron:Universidad de MontevideoSoftware 3D VentsimPlanificaciónLargo plazoMina Santander – GlencoreVentsim 3D softwarePlanningLong termSantander – Glencore MineSoftware 3D VentsimPlanejamentoLongo prazoSantander Mine – GlencorePlanning of the ventilation system and long-term 3D design with the 3D ventsim software, case Santander – Glencore MinePlanificación del sistema de ventilación y diseño 3D a largo plazo con el software 3D ventsim, caso Mina Santander – GlencorePlanejamento do sistema de ventilação e projeto 3D de longo prazo com o software 3D ventsim, caso Mina Santander – Glencoreinfo:eu-repo/semantics/articleinfo:eu-repo/semantics/publishedVersionPeer reviewed articlesArtículos evaluados por paresArtigos revistos por parespublishedVersioninfo:eu-repo/semantics/publishedVersion20.500.12806/25792024-07-17 09:46:46.913oai:redum.um.edu.uy:20.500.12806/2579Universidadhttps://um.edu.uy/https://redum.um.edu.uy/oai/requestnolascoaga@um.edu.uyUruguayopendoar:105012024-07-17T12:46:46REDUM - Universidad de Montevideofalse
spellingShingle Planning of the ventilation system and long-term 3D design with the 3D ventsim software, case Santander – Glencore Mine
Ponce Estrada, Víctor A.
Software 3D Ventsim
Planificación
Largo plazo
Mina Santander – Glencore
Ventsim 3D software
Planning
Long term
Santander – Glencore Mine
Software 3D Ventsim
Planejamento
Longo prazo
Santander Mine – Glencore
status_str publishedVersion
title Planning of the ventilation system and long-term 3D design with the 3D ventsim software, case Santander – Glencore Mine
title_full Planning of the ventilation system and long-term 3D design with the 3D ventsim software, case Santander – Glencore Mine
title_fullStr Planning of the ventilation system and long-term 3D design with the 3D ventsim software, case Santander – Glencore Mine
title_full_unstemmed Planning of the ventilation system and long-term 3D design with the 3D ventsim software, case Santander – Glencore Mine
title_short Planning of the ventilation system and long-term 3D design with the 3D ventsim software, case Santander – Glencore Mine
title_sort Planning of the ventilation system and long-term 3D design with the 3D ventsim software, case Santander – Glencore Mine
topic Software 3D Ventsim
Planificación
Largo plazo
Mina Santander – Glencore
Ventsim 3D software
Planning
Long term
Santander – Glencore Mine
Software 3D Ventsim
Planejamento
Longo prazo
Santander Mine – Glencore
url http://revistas.um.edu.uy/index.php/ingenieria/article/view/1140