Planning of the ventilation system and long-term 3D design with the 3D ventsim software, case Santander – Glencore Mine
Planificación del sistema de ventilación y diseño 3D a largo plazo con el software 3D ventsim, caso Mina Santander – Glencore
Planejamento do sistema de ventilação e projeto 3D de longo prazo com o software 3D ventsim, caso Mina Santander – Glencore
2023 | |
Software 3D Ventsim Planificación Largo plazo Mina Santander – Glencore Ventsim 3D software Planning Long term Santander – Glencore Mine Software 3D Ventsim Planejamento Longo prazo Santander Mine – Glencore |
|
Español | |
Universidad de Montevideo | |
REDUM | |
http://revistas.um.edu.uy/index.php/ingenieria/article/view/1140 | |
Acceso abierto | |
Atribución 4.0 Internacional |
Sumario: | In the country, one of the biggest challenges of underground mining is the supply of the air flow required in the work fronts according to D.S. 023-2016-EM and its amendment D.S. 024-2017-EM. In the Santander mining unit, Glencore, ventilation is forced due to the depression exerted by the three main fans, 100k cfm, 160 cfm and 120k cfm; located on the surface of the mine. The clean air requirement at this mining unit is 421,940 cfm, but the clean air inlet is 431,145 cfm and the outlet is 432,531 cfm, implying 102% coverage. In order to temporarily meet the projected long-term air requirement, medium-term planning is carried out; To solve this planning deficiency, the 3D Ventsim software is applied, which, calibrated at 90%, simulates the simulation of the ventilation system in reliable scenarios. In conclusion, the planning of a ventilation system with the Ventsim design program allows to comply with the required air in the long term and to carry out a detailed evaluation of the behavior of the ventilation system in the long term. |
---|