Vertical formwork design: Dimensioning and Minimum Demoulding Times

Diseño de encofrados verticales: dimensionado y tiempos mínimos de desencofrado

Teixeira, Sofía - Santilli, Adrián - Puente, Iñigo
Detalles Bibliográficos
2015
Hormigón autocompactante (HAC)
Encofrados verticales
Presión lateral
Tiempos mínimos de desencofrado
Self-compacting concrete (SCC)
Vertical formwork
Lateral pressure
Minimum demoulding times
Español
Universidad de Montevideo
REDUM
http://revistas.um.edu.uy/index.php/ingenieria/article/view/338
Acceso abierto
Atribución 4.0 Internacional
_version_ 1811886514875924480
author Teixeira, Sofía
author2 Santilli, Adrián
Puente, Iñigo
author2_role author
author
author_facet Teixeira, Sofía
Santilli, Adrián
Puente, Iñigo
author_role author
collection REDUM
dc.creator.none.fl_str_mv Teixeira, Sofía
Santilli, Adrián
Puente, Iñigo
dc.date.none.fl_str_mv 2015-11-02
dc.description.en-US.fl_txt_mv The design of vertical formworks depends on the maximum lateral pressure exerted by fresh concrete for dimensioning the panels and the time needed for use it. In this work, the experimental models to predict the maximum lateral pressure exerted by the self-compacting concrete (SCC) on vertical formwork are described. On the other hand, the minimum demoulding times proposed by different normatives and different researches in the literature are described. Finally, a formwork removal method based on the ASTM 403 standard is developed and experimental tests were carried out in Uruguay for the validation of the presented method.
dc.description.es-ES.fl_txt_mv El diseño de encofrados verticales depende de la predicción de la máxima presión lateral ejercida por el hormigón en estado fresco para el dimensionado de los paneles y del tiempo necesario de utilización de los mismos. En este trabajo se describen los modelos experimentales descritos en la bibliografía para predecir la máxima presión lateral ejercida por el hormigón autocompactante (HAC) en encofrados verticales y los tiempos de desencofrados propuestos por las diferentes normativas y los distintos autores en la literatura. Finalmente, se presenta un método de desencofrado desarrollado en base a la norma ASTM 1074 y la campaña experimental realizada en una de las hormigoneras más grandes de Uruguay para la validación de dicho método.
dc.format.none.fl_str_mv application/pdf
dc.identifier.none.fl_str_mv http://revistas.um.edu.uy/index.php/ingenieria/article/view/338
dc.language.iso.none.fl_str_mv spa
dc.publisher.es-ES.fl_str_mv Universidad de Montevideo
dc.relation.none.fl_str_mv http://revistas.um.edu.uy/index.php/ingenieria/article/view/338/408
dc.rights.es-ES.fl_str_mv Derechos de autor 2019 Sofía Teixeira, Adrián Santilli, Iñigo Puente
http://creativecommons.org/licenses/by/4.0
dc.rights.license.none.fl_str_mv Atribución 4.0 Internacional
dc.rights.none.fl_str_mv info:eu-repo/semantics/openAccess
dc.source.en-US.fl_str_mv Memoria Investigaciones en Ingeniería; No. 13 (2015); 7-16
dc.source.es-ES.fl_str_mv Memoria Investigaciones en Ingeniería; Núm. 13 (2015); 7-16
dc.source.none.fl_str_mv 2301-1106
2301-1092
reponame:REDUM
instname:Universidad de Montevideo
instacron:Universidad de Montevideo
dc.source.pt-BR.fl_str_mv Memoria Investigaciones en Ingenieria; n. 13 (2015); 7-16
dc.subject.en-US.fl_str_mv Self-compacting concrete (SCC)
Vertical formwork
Lateral pressure
Minimum demoulding times
dc.subject.es-ES.fl_str_mv Hormigón autocompactante (HAC)
Encofrados verticales
Presión lateral
Tiempos mínimos de desencofrado
dc.title.none.fl_str_mv Vertical formwork design: Dimensioning and Minimum Demoulding Times
Diseño de encofrados verticales: dimensionado y tiempos mínimos de desencofrado
dc.type.en-US.fl_str_mv Peer reviewed articles
dc.type.es-ES.fl_str_mv Artículos evaluados por pares
dc.type.none.fl_str_mv info:eu-repo/semantics/article
info:eu-repo/semantics/publishedVersion
dc.type.pt-BR.fl_str_mv Artigos revistos por pares
dc.type.version.none.fl_str_mv publishedVersion
info:eu-repo/semantics/publishedVersion
description The design of vertical formworks depends on the maximum lateral pressure exerted by fresh concrete for dimensioning the panels and the time needed for use it. In this work, the experimental models to predict the maximum lateral pressure exerted by the self-compacting concrete (SCC) on vertical formwork are described. On the other hand, the minimum demoulding times proposed by different normatives and different researches in the literature are described. Finally, a formwork removal method based on the ASTM 403 standard is developed and experimental tests were carried out in Uruguay for the validation of the presented method.
eu_rights_str_mv openAccess
format article
id REDUM_79d2038bed00543a8ded9405120b4a1d
instacron_str Universidad de Montevideo
institution Universidad de Montevideo
instname_str Universidad de Montevideo
language spa
network_acronym_str REDUM
network_name_str REDUM
oai_identifier_str oai:redum.um.edu.uy:20.500.12806/2493
publishDate 2015
reponame_str REDUM
repository.mail.fl_str_mv nolascoaga@um.edu.uy
repository.name.fl_str_mv REDUM - Universidad de Montevideo
repository_id_str 10501
rights_invalid_str_mv Derechos de autor 2019 Sofía Teixeira, Adrián Santilli, Iñigo Puente
http://creativecommons.org/licenses/by/4.0
Atribución 4.0 Internacional
spelling Teixeira, SofíaSantilli, AdriánPuente, Iñigo2015-11-02http://revistas.um.edu.uy/index.php/ingenieria/article/view/338The design of vertical formworks depends on the maximum lateral pressure exerted by fresh concrete for dimensioning the panels and the time needed for use it. In this work, the experimental models to predict the maximum lateral pressure exerted by the self-compacting concrete (SCC) on vertical formwork are described. On the other hand, the minimum demoulding times proposed by different normatives and different researches in the literature are described. Finally, a formwork removal method based on the ASTM 403 standard is developed and experimental tests were carried out in Uruguay for the validation of the presented method.El diseño de encofrados verticales depende de la predicción de la máxima presión lateral ejercida por el hormigón en estado fresco para el dimensionado de los paneles y del tiempo necesario de utilización de los mismos. En este trabajo se describen los modelos experimentales descritos en la bibliografía para predecir la máxima presión lateral ejercida por el hormigón autocompactante (HAC) en encofrados verticales y los tiempos de desencofrados propuestos por las diferentes normativas y los distintos autores en la literatura. Finalmente, se presenta un método de desencofrado desarrollado en base a la norma ASTM 1074 y la campaña experimental realizada en una de las hormigoneras más grandes de Uruguay para la validación de dicho método.application/pdfspaUniversidad de Montevideohttp://revistas.um.edu.uy/index.php/ingenieria/article/view/338/408Derechos de autor 2019 Sofía Teixeira, Adrián Santilli, Iñigo Puentehttp://creativecommons.org/licenses/by/4.0info:eu-repo/semantics/openAccessAtribución 4.0 InternacionalMemoria Investigaciones en Ingeniería; No. 13 (2015); 7-16Memoria Investigaciones en Ingeniería; Núm. 13 (2015); 7-16Memoria Investigaciones en Ingenieria; n. 13 (2015); 7-162301-11062301-1092reponame:REDUMinstname:Universidad de Montevideoinstacron:Universidad de MontevideoHormigón autocompactante (HAC)Encofrados verticalesPresión lateralTiempos mínimos de desencofradoSelf-compacting concrete (SCC)Vertical formworkLateral pressureMinimum demoulding timesVertical formwork design: Dimensioning and Minimum Demoulding TimesDiseño de encofrados verticales: dimensionado y tiempos mínimos de desencofradoinfo:eu-repo/semantics/articleinfo:eu-repo/semantics/publishedVersionPeer reviewed articlesArtículos evaluados por paresArtigos revistos por parespublishedVersioninfo:eu-repo/semantics/publishedVersion20.500.12806/24932024-10-01 12:10:10.354oai:redum.um.edu.uy:20.500.12806/2493Universidadhttps://um.edu.uy/https://redum.um.edu.uy/oai/requestnolascoaga@um.edu.uyUruguayopendoar:105012024-10-01T15:10:10REDUM - Universidad de Montevideofalse
spellingShingle Vertical formwork design: Dimensioning and Minimum Demoulding Times
Teixeira, Sofía
Hormigón autocompactante (HAC)
Encofrados verticales
Presión lateral
Tiempos mínimos de desencofrado
Self-compacting concrete (SCC)
Vertical formwork
Lateral pressure
Minimum demoulding times
status_str publishedVersion
title Vertical formwork design: Dimensioning and Minimum Demoulding Times
title_full Vertical formwork design: Dimensioning and Minimum Demoulding Times
title_fullStr Vertical formwork design: Dimensioning and Minimum Demoulding Times
title_full_unstemmed Vertical formwork design: Dimensioning and Minimum Demoulding Times
title_short Vertical formwork design: Dimensioning and Minimum Demoulding Times
title_sort Vertical formwork design: Dimensioning and Minimum Demoulding Times
topic Hormigón autocompactante (HAC)
Encofrados verticales
Presión lateral
Tiempos mínimos de desencofrado
Self-compacting concrete (SCC)
Vertical formwork
Lateral pressure
Minimum demoulding times
url http://revistas.um.edu.uy/index.php/ingenieria/article/view/338