Vertical formwork design: Dimensioning and Minimum Demoulding Times
Diseño de encofrados verticales: dimensionado y tiempos mínimos de desencofrado
2015 | |
Hormigón autocompactante (HAC) Encofrados verticales Presión lateral Tiempos mínimos de desencofrado Self-compacting concrete (SCC) Vertical formwork Lateral pressure Minimum demoulding times |
|
Español | |
Universidad de Montevideo | |
REDUM | |
http://revistas.um.edu.uy/index.php/ingenieria/article/view/338 | |
Acceso abierto | |
Atribución 4.0 Internacional |
_version_ | 1811886514875924480 |
---|---|
author | Teixeira, Sofía |
author2 | Santilli, Adrián Puente, Iñigo |
author2_role | author author |
author_facet | Teixeira, Sofía Santilli, Adrián Puente, Iñigo |
author_role | author |
collection | REDUM |
dc.creator.none.fl_str_mv | Teixeira, Sofía Santilli, Adrián Puente, Iñigo |
dc.date.none.fl_str_mv | 2015-11-02 |
dc.description.en-US.fl_txt_mv | The design of vertical formworks depends on the maximum lateral pressure exerted by fresh concrete for dimensioning the panels and the time needed for use it. In this work, the experimental models to predict the maximum lateral pressure exerted by the self-compacting concrete (SCC) on vertical formwork are described. On the other hand, the minimum demoulding times proposed by different normatives and different researches in the literature are described. Finally, a formwork removal method based on the ASTM 403 standard is developed and experimental tests were carried out in Uruguay for the validation of the presented method. |
dc.description.es-ES.fl_txt_mv | El diseño de encofrados verticales depende de la predicción de la máxima presión lateral ejercida por el hormigón en estado fresco para el dimensionado de los paneles y del tiempo necesario de utilización de los mismos. En este trabajo se describen los modelos experimentales descritos en la bibliografía para predecir la máxima presión lateral ejercida por el hormigón autocompactante (HAC) en encofrados verticales y los tiempos de desencofrados propuestos por las diferentes normativas y los distintos autores en la literatura. Finalmente, se presenta un método de desencofrado desarrollado en base a la norma ASTM 1074 y la campaña experimental realizada en una de las hormigoneras más grandes de Uruguay para la validación de dicho método. |
dc.format.none.fl_str_mv | application/pdf |
dc.identifier.none.fl_str_mv | http://revistas.um.edu.uy/index.php/ingenieria/article/view/338 |
dc.language.iso.none.fl_str_mv | spa |
dc.publisher.es-ES.fl_str_mv | Universidad de Montevideo |
dc.relation.none.fl_str_mv | http://revistas.um.edu.uy/index.php/ingenieria/article/view/338/408 |
dc.rights.es-ES.fl_str_mv | Derechos de autor 2019 Sofía Teixeira, Adrián Santilli, Iñigo Puente http://creativecommons.org/licenses/by/4.0 |
dc.rights.license.none.fl_str_mv | Atribución 4.0 Internacional |
dc.rights.none.fl_str_mv | info:eu-repo/semantics/openAccess |
dc.source.en-US.fl_str_mv | Memoria Investigaciones en Ingeniería; No. 13 (2015); 7-16 |
dc.source.es-ES.fl_str_mv | Memoria Investigaciones en Ingeniería; Núm. 13 (2015); 7-16 |
dc.source.none.fl_str_mv | 2301-1106 2301-1092 reponame:REDUM instname:Universidad de Montevideo instacron:Universidad de Montevideo |
dc.source.pt-BR.fl_str_mv | Memoria Investigaciones en Ingenieria; n. 13 (2015); 7-16 |
dc.subject.en-US.fl_str_mv | Self-compacting concrete (SCC) Vertical formwork Lateral pressure Minimum demoulding times |
dc.subject.es-ES.fl_str_mv | Hormigón autocompactante (HAC) Encofrados verticales Presión lateral Tiempos mínimos de desencofrado |
dc.title.none.fl_str_mv | Vertical formwork design: Dimensioning and Minimum Demoulding Times Diseño de encofrados verticales: dimensionado y tiempos mínimos de desencofrado |
dc.type.en-US.fl_str_mv | Peer reviewed articles |
dc.type.es-ES.fl_str_mv | Artículos evaluados por pares |
dc.type.none.fl_str_mv | info:eu-repo/semantics/article info:eu-repo/semantics/publishedVersion |
dc.type.pt-BR.fl_str_mv | Artigos revistos por pares |
dc.type.version.none.fl_str_mv | publishedVersion info:eu-repo/semantics/publishedVersion |
description | The design of vertical formworks depends on the maximum lateral pressure exerted by fresh concrete for dimensioning the panels and the time needed for use it. In this work, the experimental models to predict the maximum lateral pressure exerted by the self-compacting concrete (SCC) on vertical formwork are described. On the other hand, the minimum demoulding times proposed by different normatives and different researches in the literature are described. Finally, a formwork removal method based on the ASTM 403 standard is developed and experimental tests were carried out in Uruguay for the validation of the presented method. |
eu_rights_str_mv | openAccess |
format | article |
id | REDUM_79d2038bed00543a8ded9405120b4a1d |
instacron_str | Universidad de Montevideo |
institution | Universidad de Montevideo |
instname_str | Universidad de Montevideo |
language | spa |
network_acronym_str | REDUM |
network_name_str | REDUM |
oai_identifier_str | oai:redum.um.edu.uy:20.500.12806/2493 |
publishDate | 2015 |
reponame_str | REDUM |
repository.mail.fl_str_mv | nolascoaga@um.edu.uy |
repository.name.fl_str_mv | REDUM - Universidad de Montevideo |
repository_id_str | 10501 |
rights_invalid_str_mv | Derechos de autor 2019 Sofía Teixeira, Adrián Santilli, Iñigo Puente http://creativecommons.org/licenses/by/4.0 Atribución 4.0 Internacional |
spelling | Teixeira, SofíaSantilli, AdriánPuente, Iñigo2015-11-02http://revistas.um.edu.uy/index.php/ingenieria/article/view/338The design of vertical formworks depends on the maximum lateral pressure exerted by fresh concrete for dimensioning the panels and the time needed for use it. In this work, the experimental models to predict the maximum lateral pressure exerted by the self-compacting concrete (SCC) on vertical formwork are described. On the other hand, the minimum demoulding times proposed by different normatives and different researches in the literature are described. Finally, a formwork removal method based on the ASTM 403 standard is developed and experimental tests were carried out in Uruguay for the validation of the presented method.El diseño de encofrados verticales depende de la predicción de la máxima presión lateral ejercida por el hormigón en estado fresco para el dimensionado de los paneles y del tiempo necesario de utilización de los mismos. En este trabajo se describen los modelos experimentales descritos en la bibliografía para predecir la máxima presión lateral ejercida por el hormigón autocompactante (HAC) en encofrados verticales y los tiempos de desencofrados propuestos por las diferentes normativas y los distintos autores en la literatura. Finalmente, se presenta un método de desencofrado desarrollado en base a la norma ASTM 1074 y la campaña experimental realizada en una de las hormigoneras más grandes de Uruguay para la validación de dicho método.application/pdfspaUniversidad de Montevideohttp://revistas.um.edu.uy/index.php/ingenieria/article/view/338/408Derechos de autor 2019 Sofía Teixeira, Adrián Santilli, Iñigo Puentehttp://creativecommons.org/licenses/by/4.0info:eu-repo/semantics/openAccessAtribución 4.0 InternacionalMemoria Investigaciones en Ingeniería; No. 13 (2015); 7-16Memoria Investigaciones en Ingeniería; Núm. 13 (2015); 7-16Memoria Investigaciones en Ingenieria; n. 13 (2015); 7-162301-11062301-1092reponame:REDUMinstname:Universidad de Montevideoinstacron:Universidad de MontevideoHormigón autocompactante (HAC)Encofrados verticalesPresión lateralTiempos mínimos de desencofradoSelf-compacting concrete (SCC)Vertical formworkLateral pressureMinimum demoulding timesVertical formwork design: Dimensioning and Minimum Demoulding TimesDiseño de encofrados verticales: dimensionado y tiempos mínimos de desencofradoinfo:eu-repo/semantics/articleinfo:eu-repo/semantics/publishedVersionPeer reviewed articlesArtículos evaluados por paresArtigos revistos por parespublishedVersioninfo:eu-repo/semantics/publishedVersion20.500.12806/24932024-10-01 12:10:10.354oai:redum.um.edu.uy:20.500.12806/2493Universidadhttps://um.edu.uy/https://redum.um.edu.uy/oai/requestnolascoaga@um.edu.uyUruguayopendoar:105012024-10-01T15:10:10REDUM - Universidad de Montevideofalse |
spellingShingle | Vertical formwork design: Dimensioning and Minimum Demoulding Times Teixeira, Sofía Hormigón autocompactante (HAC) Encofrados verticales Presión lateral Tiempos mínimos de desencofrado Self-compacting concrete (SCC) Vertical formwork Lateral pressure Minimum demoulding times |
status_str | publishedVersion |
title | Vertical formwork design: Dimensioning and Minimum Demoulding Times |
title_full | Vertical formwork design: Dimensioning and Minimum Demoulding Times |
title_fullStr | Vertical formwork design: Dimensioning and Minimum Demoulding Times |
title_full_unstemmed | Vertical formwork design: Dimensioning and Minimum Demoulding Times |
title_short | Vertical formwork design: Dimensioning and Minimum Demoulding Times |
title_sort | Vertical formwork design: Dimensioning and Minimum Demoulding Times |
topic | Hormigón autocompactante (HAC) Encofrados verticales Presión lateral Tiempos mínimos de desencofrado Self-compacting concrete (SCC) Vertical formwork Lateral pressure Minimum demoulding times |
url | http://revistas.um.edu.uy/index.php/ingenieria/article/view/338 |