Measurements for validation of manufacturer’s white-box transformer models
Resumen:
The transformer manufacturers make use of electromagnetic transient calculations by detailed white-box models to ensure that the transformer will withstand the lightning impulse test during the factory acceptance test. In principle, such models could be used in general electromagnetic transient simulation of overvoltages in the system. One of the objectives of CIGRE JWG A2/C4.52 is to assess the accuracy of the manufacturer’s white-box models in the context of general transient overvoltages that can occur in the system. As part of this activity, extensive measurements have been performed on two three-winding transformers: one three-phase unit and one single-phase unit. The measurements involved voltage transfer between external terminals and from external terminals to three points in the regulating winding. The measurements were performed with alternative points of voltage excitation, grounding conditions and alternative tap settings, giving 64 cases for each transformer. Some admittance measurements were also performed. This paper gives an overview of the measurements that were performed, the measurement procedure, and some initial results. The voltage transfer measurements were mostly performed in the frequency domain and transferred to the time domain via rational function approximation and recursive convolutions. That way, voltage transfer functions have been generated for well-defined excitations, e.g. the standard 1.2/50 µs voltage wave. In addition, initial results for black-box modeling of the three-phase unit is shown. The measurements are currently being used within CIGRE JWG A2/C4.52 for benchmarking of white-box models
2017 | |
Transformer White-box Black-box Grey-box Measurement Overvoltages Electromagnetic transients Potencia |
|
Inglés | |
Universidad de la República | |
COLIBRI | |
https://hdl.handle.net/20.500.12008/43507
https://doi.org/10.1016/j.proeng.2017.09.711 |
|
Acceso abierto | |
Licencia Creative Commons Atribución – No Comercial (CC – By-NC) |
_version_ | 1807522942012096512 |
---|---|
author | Gustavsen, Bjørn |
author2 | Portillo, Alvaro Ronchi, Rodrigo Mjelve, Asgeir |
author2_role | author author author |
author_facet | Gustavsen, Bjørn Portillo, Alvaro Ronchi, Rodrigo Mjelve, Asgeir |
author_role | author |
bitstream.checksum.fl_str_mv | 528b6a3c8c7d0c6e28129d576e989607 9833653f73f7853880c94a6fead477b1 4afdbb8c545fd630ea7db775da747b2f 9da0b6dfac957114c6a7714714b86306 3a2ba56880380fa2c611edeae20b8599 |
bitstream.checksumAlgorithm.fl_str_mv | MD5 MD5 MD5 MD5 MD5 |
bitstream.url.fl_str_mv | http://localhost:8080/xmlui/bitstream/20.500.12008/43507/5/license.txt http://localhost:8080/xmlui/bitstream/20.500.12008/43507/2/license_text http://localhost:8080/xmlui/bitstream/20.500.12008/43507/3/license_url http://localhost:8080/xmlui/bitstream/20.500.12008/43507/4/license_rdf http://localhost:8080/xmlui/bitstream/20.500.12008/43507/1/GPRM17.pdf |
collection | COLIBRI |
dc.creator.none.fl_str_mv | Gustavsen, Bjørn Portillo, Alvaro Ronchi, Rodrigo Mjelve, Asgeir |
dc.date.accessioned.none.fl_str_mv | 2024-04-16T16:21:05Z |
dc.date.available.none.fl_str_mv | 2024-04-16T16:21:05Z |
dc.date.issued.es.fl_str_mv | 2017 |
dc.date.submitted.es.fl_str_mv | 20240416 |
dc.description.abstract.none.fl_txt_mv | The transformer manufacturers make use of electromagnetic transient calculations by detailed white-box models to ensure that the transformer will withstand the lightning impulse test during the factory acceptance test. In principle, such models could be used in general electromagnetic transient simulation of overvoltages in the system. One of the objectives of CIGRE JWG A2/C4.52 is to assess the accuracy of the manufacturer’s white-box models in the context of general transient overvoltages that can occur in the system. As part of this activity, extensive measurements have been performed on two three-winding transformers: one three-phase unit and one single-phase unit. The measurements involved voltage transfer between external terminals and from external terminals to three points in the regulating winding. The measurements were performed with alternative points of voltage excitation, grounding conditions and alternative tap settings, giving 64 cases for each transformer. Some admittance measurements were also performed. This paper gives an overview of the measurements that were performed, the measurement procedure, and some initial results. The voltage transfer measurements were mostly performed in the frequency domain and transferred to the time domain via rational function approximation and recursive convolutions. That way, voltage transfer functions have been generated for well-defined excitations, e.g. the standard 1.2/50 µs voltage wave. In addition, initial results for black-box modeling of the three-phase unit is shown. The measurements are currently being used within CIGRE JWG A2/C4.52 for benchmarking of white-box models |
dc.description.es.fl_txt_mv | 4th International Colloquium "Transformer Research and Asset Management” |
dc.identifier.citation.es.fl_str_mv | Gustavsen, B, Portillo, A, Ronchi, R, Mjelve, A. "Measurements for validation of manufacturer’s white-box transformer models" Procedia Engineering, v. 202, 2017, pp. 240-250. Special issue of the 4th International Colloquium "Transformer Research and Asset Management" doi: https://doi.org/10.1016/j.proeng.2017.09.711 |
dc.identifier.doi.es.fl_str_mv | https://doi.org/10.1016/j.proeng.2017.09.711 |
dc.identifier.issn.es.fl_str_mv | 1877-7058 |
dc.identifier.uri.none.fl_str_mv | https://hdl.handle.net/20.500.12008/43507 |
dc.language.iso.none.fl_str_mv | en eng |
dc.publisher.es.fl_str_mv | Elsevier |
dc.relation.ispartof.es.fl_str_mv | Procedia Engineering, v. 202, 2017, pp. 240-250 |
dc.rights.license.none.fl_str_mv | Licencia Creative Commons Atribución – No Comercial (CC – By-NC) |
dc.rights.none.fl_str_mv | info:eu-repo/semantics/openAccess |
dc.source.none.fl_str_mv | reponame:COLIBRI instname:Universidad de la República instacron:Universidad de la República |
dc.subject.es.fl_str_mv | Transformer White-box Black-box Grey-box Measurement Overvoltages Electromagnetic transients |
dc.subject.other.es.fl_str_mv | Potencia |
dc.title.none.fl_str_mv | Measurements for validation of manufacturer’s white-box transformer models |
dc.type.es.fl_str_mv | Ponencia |
dc.type.none.fl_str_mv | info:eu-repo/semantics/conferenceObject |
dc.type.version.none.fl_str_mv | info:eu-repo/semantics/publishedVersion |
description | 4th International Colloquium "Transformer Research and Asset Management” |
eu_rights_str_mv | openAccess |
format | conferenceObject |
id | COLIBRI_e3faab402d8f1e0d6ef56b46d06e1a7c |
identifier_str_mv | Gustavsen, B, Portillo, A, Ronchi, R, Mjelve, A. "Measurements for validation of manufacturer’s white-box transformer models" Procedia Engineering, v. 202, 2017, pp. 240-250. Special issue of the 4th International Colloquium "Transformer Research and Asset Management" doi: https://doi.org/10.1016/j.proeng.2017.09.711 1877-7058 |
instacron_str | Universidad de la República |
institution | Universidad de la República |
instname_str | Universidad de la República |
language | eng |
language_invalid_str_mv | en |
network_acronym_str | COLIBRI |
network_name_str | COLIBRI |
oai_identifier_str | oai:colibri.udelar.edu.uy:20.500.12008/43507 |
publishDate | 2017 |
reponame_str | COLIBRI |
repository.mail.fl_str_mv | mabel.seroubian@seciu.edu.uy |
repository.name.fl_str_mv | COLIBRI - Universidad de la República |
repository_id_str | 4771 |
rights_invalid_str_mv | Licencia Creative Commons Atribución – No Comercial (CC – By-NC) |
spelling | 2024-04-16T16:21:05Z2024-04-16T16:21:05Z201720240416Gustavsen, B, Portillo, A, Ronchi, R, Mjelve, A. "Measurements for validation of manufacturer’s white-box transformer models" Procedia Engineering, v. 202, 2017, pp. 240-250. Special issue of the 4th International Colloquium "Transformer Research and Asset Management" doi: https://doi.org/10.1016/j.proeng.2017.09.7111877-7058https://hdl.handle.net/20.500.12008/43507https://doi.org/10.1016/j.proeng.2017.09.7114th International Colloquium "Transformer Research and Asset Management”The transformer manufacturers make use of electromagnetic transient calculations by detailed white-box models to ensure that the transformer will withstand the lightning impulse test during the factory acceptance test. In principle, such models could be used in general electromagnetic transient simulation of overvoltages in the system. One of the objectives of CIGRE JWG A2/C4.52 is to assess the accuracy of the manufacturer’s white-box models in the context of general transient overvoltages that can occur in the system. As part of this activity, extensive measurements have been performed on two three-winding transformers: one three-phase unit and one single-phase unit. The measurements involved voltage transfer between external terminals and from external terminals to three points in the regulating winding. The measurements were performed with alternative points of voltage excitation, grounding conditions and alternative tap settings, giving 64 cases for each transformer. Some admittance measurements were also performed. This paper gives an overview of the measurements that were performed, the measurement procedure, and some initial results. The voltage transfer measurements were mostly performed in the frequency domain and transferred to the time domain via rational function approximation and recursive convolutions. That way, voltage transfer functions have been generated for well-defined excitations, e.g. the standard 1.2/50 µs voltage wave. In addition, initial results for black-box modeling of the three-phase unit is shown. The measurements are currently being used within CIGRE JWG A2/C4.52 for benchmarking of white-box modelsMade available in DSpace on 2024-04-16T16:21:05Z (GMT). No. of bitstreams: 5 GPRM17.pdf: 1824184 bytes, checksum: 3a2ba56880380fa2c611edeae20b8599 (MD5) license_text: 21936 bytes, checksum: 9833653f73f7853880c94a6fead477b1 (MD5) license_url: 49 bytes, checksum: 4afdbb8c545fd630ea7db775da747b2f (MD5) license_rdf: 23148 bytes, checksum: 9da0b6dfac957114c6a7714714b86306 (MD5) license.txt: 4244 bytes, checksum: 528b6a3c8c7d0c6e28129d576e989607 (MD5) Previous issue date: 2017enengElsevierProcedia Engineering, v. 202, 2017, pp. 240-250Las obras depositadas en el Repositorio se rigen por la Ordenanza de los Derechos de la Propiedad Intelectual de la Universidad De La República. (Res. Nº 91 de C.D.C. de 8/III/1994 – D.O. 7/IV/1994) y por la Ordenanza del Repositorio Abierto de la Universidad de la República (Res. Nº 16 de C.D.C. de 07/10/2014)info:eu-repo/semantics/openAccessLicencia Creative Commons Atribución – No Comercial (CC – By-NC)TransformerWhite-boxBlack-boxGrey-boxMeasurementOvervoltagesElectromagnetic transientsPotenciaMeasurements for validation of manufacturer’s white-box transformer modelsPonenciainfo:eu-repo/semantics/conferenceObjectinfo:eu-repo/semantics/publishedVersionreponame:COLIBRIinstname:Universidad de la Repúblicainstacron:Universidad de la RepúblicaGustavsen, BjørnPortillo, AlvaroRonchi, RodrigoMjelve, AsgeirLICENSElicense.txttext/plain4244http://localhost:8080/xmlui/bitstream/20.500.12008/43507/5/license.txt528b6a3c8c7d0c6e28129d576e989607MD55CC-LICENSElicense_textapplication/octet-stream21936http://localhost:8080/xmlui/bitstream/20.500.12008/43507/2/license_text9833653f73f7853880c94a6fead477b1MD52license_urlapplication/octet-stream49http://localhost:8080/xmlui/bitstream/20.500.12008/43507/3/license_url4afdbb8c545fd630ea7db775da747b2fMD53license_rdfapplication/octet-stream23148http://localhost:8080/xmlui/bitstream/20.500.12008/43507/4/license_rdf9da0b6dfac957114c6a7714714b86306MD54ORIGINALGPRM17.pdfapplication/pdf1824184http://localhost:8080/xmlui/bitstream/20.500.12008/43507/1/GPRM17.pdf3a2ba56880380fa2c611edeae20b8599MD5120.500.12008/435072024-04-16 13:21:05.926oai:colibri.udelar.edu.uy:20.500.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Universidadhttps://udelar.edu.uy/https://www.colibri.udelar.edu.uy/oai/requestmabel.seroubian@seciu.edu.uyUruguayopendoar:47712024-07-25T14:33:49.965447COLIBRI - Universidad de la Repúblicafalse |
spellingShingle | Measurements for validation of manufacturer’s white-box transformer models Gustavsen, Bjørn Transformer White-box Black-box Grey-box Measurement Overvoltages Electromagnetic transients Potencia |
status_str | publishedVersion |
title | Measurements for validation of manufacturer’s white-box transformer models |
title_full | Measurements for validation of manufacturer’s white-box transformer models |
title_fullStr | Measurements for validation of manufacturer’s white-box transformer models |
title_full_unstemmed | Measurements for validation of manufacturer’s white-box transformer models |
title_short | Measurements for validation of manufacturer’s white-box transformer models |
title_sort | Measurements for validation of manufacturer’s white-box transformer models |
topic | Transformer White-box Black-box Grey-box Measurement Overvoltages Electromagnetic transients Potencia |
url | https://hdl.handle.net/20.500.12008/43507 https://doi.org/10.1016/j.proeng.2017.09.711 |