Integration of P2X process to grid: needs for plant models for a smooth transition

Corengia, Mariana - Acosta, Pablo - Rojas, Leonardo - Villanueva, Juan Pablo - Ohanian, Mauricio

Resumen:

The installation of big scale projects to produce decarbonized materials such as green ammonia, green methanol or e-fuels require the incorporation of large amounts of renewable energy. If these new energy sources have variable and non-programmable availability patterns (such as wind energy or solar irradiation), the production facilities will have to cope with additional costs. These costs may involve the installation of energy storage (like batteries), installation of storage for intermediate products (for instance, hydrogen), and faster degradation due to unsteady operation and/or idle installed capacity. The relative impact of these costs will rely on whether the strategy is to prioritize the operation of the process at its designed-capacity (through strategies like energy storage or grid support), or to prioritize flexible operation by utilizing the resources when they are available (which implies non-steady operation). Relying on the electric grid to provide part of the energy supply has other implications. On the one hand, CO2 emissions of the final product will depend on the emissions associated to the production of energy. On the other hand, the required energy may or not be available from the grid. This last point is of particular interest in cases where the projected facilities imply big loads in comparison to the electric grid. For example, in Uruguay current electric power production capacity is 5.3 GW (24% from fossil fuels), and some of the announced projects imply 2 and 3 GW of new generation capacity. In this talk, we will go through the analysis of two examples of Power-to-X (P2X) processes: ammonia and methanol production. Based on case studies from "conventional” (not green) processes, and the available data on electrolyzer systems, the technical flexibility of each P2X process and its subsystems can be obtained. Then, relevant information can be obtained for different scenarios: the amount of energy that should be available from the grid in a scenario of plants connected to the grid, or the requirement of storage options for an isolated plant. These analyses, based on the models of the chemical plants, are required to understand the costs associated with the usage of variable energy sources, and its implications in the tradeoffs when balancing the reduction of CO2 emissions and the final production costs of green ammonia or methanol.

Detalles Bibliográficos
2024
Proyecto ANII MOV_CO_HV_1_2023_1_176875 y Convenio entre UTE y la Fundación Julio Ricaldoni "PROPUESTA TÉCNICA UTE 2018 002/2023".
Inglés
Universidad de la República
COLIBRI
https://hdl.handle.net/20.500.12008/53360
Acceso abierto
Licencia Creative Commons Atribución - No Comercial - Sin Derivadas (CC - By-NC-ND 4.0)
_version_ 1872865319412826112
author Corengia, Mariana
author2 Acosta, Pablo
Rojas, Leonardo
Villanueva, Juan Pablo
Ohanian, Mauricio
author2_role author
author
author
author
author_facet Corengia, Mariana
Acosta, Pablo
Rojas, Leonardo
Villanueva, Juan Pablo
Ohanian, Mauricio
author_role author
bitstream.checksum.fl_str_mv 6429389a7df7277b72b7924fdc7d47a9
a006180e3f5b2ad0b88185d14284c0e0
a73ca8d13adf70b0d75335af21cfc665
d62648cf14c1e37917d392ac87012955
89768fc4f1a62aedc2fef6d02fa40bb6
bitstream.checksumAlgorithm.fl_str_mv MD5
MD5
MD5
MD5
MD5
bitstream.url.fl_str_mv http://localhost:8080/xmlui/bitstream/20.500.12008/53360/5/license.txt
http://localhost:8080/xmlui/bitstream/20.500.12008/53360/2/license_url
http://localhost:8080/xmlui/bitstream/20.500.12008/53360/3/license_text
http://localhost:8080/xmlui/bitstream/20.500.12008/53360/4/license_rdf
http://localhost:8080/xmlui/bitstream/20.500.12008/53360/1/CARVO24.pdf
collection COLIBRI
dc.contributor.filiacion.none.fl_str_mv Corengia Mariana, Universidad de la República (Uruguay). Facultad de Ingeniería.
Acosta Pablo, Universidad de la República (Uruguay). Facultad de Ingeniería.
Rojas Leonardo, Universidad de la República (Uruguay). Facultad de Ingeniería.
Villanueva Juan Pablo, Universidad de la República (Uruguay). Facultad de Ingeniería.
Ohanian Mauricio, Universidad de la República (Uruguay). Facultad de Ingeniería.
dc.creator.none.fl_str_mv Corengia, Mariana
Acosta, Pablo
Rojas, Leonardo
Villanueva, Juan Pablo
Ohanian, Mauricio
dc.date.accessioned.none.fl_str_mv 2026-02-04T20:29:06Z
dc.date.available.none.fl_str_mv 2026-02-04T20:29:06Z
dc.date.issued.none.fl_str_mv 2024
dc.description.abstract.none.fl_txt_mv The installation of big scale projects to produce decarbonized materials such as green ammonia, green methanol or e-fuels require the incorporation of large amounts of renewable energy. If these new energy sources have variable and non-programmable availability patterns (such as wind energy or solar irradiation), the production facilities will have to cope with additional costs. These costs may involve the installation of energy storage (like batteries), installation of storage for intermediate products (for instance, hydrogen), and faster degradation due to unsteady operation and/or idle installed capacity. The relative impact of these costs will rely on whether the strategy is to prioritize the operation of the process at its designed-capacity (through strategies like energy storage or grid support), or to prioritize flexible operation by utilizing the resources when they are available (which implies non-steady operation). Relying on the electric grid to provide part of the energy supply has other implications. On the one hand, CO2 emissions of the final product will depend on the emissions associated to the production of energy. On the other hand, the required energy may or not be available from the grid. This last point is of particular interest in cases where the projected facilities imply big loads in comparison to the electric grid. For example, in Uruguay current electric power production capacity is 5.3 GW (24% from fossil fuels), and some of the announced projects imply 2 and 3 GW of new generation capacity. In this talk, we will go through the analysis of two examples of Power-to-X (P2X) processes: ammonia and methanol production. Based on case studies from "conventional” (not green) processes, and the available data on electrolyzer systems, the technical flexibility of each P2X process and its subsystems can be obtained. Then, relevant information can be obtained for different scenarios: the amount of energy that should be available from the grid in a scenario of plants connected to the grid, or the requirement of storage options for an isolated plant. These analyses, based on the models of the chemical plants, are required to understand the costs associated with the usage of variable energy sources, and its implications in the tradeoffs when balancing the reduction of CO2 emissions and the final production costs of green ammonia or methanol.
dc.description.sponsorship.none.fl_txt_mv Proyecto ANII MOV_CO_HV_1_2023_1_176875 y Convenio entre UTE y la Fundación Julio Ricaldoni "PROPUESTA TÉCNICA UTE 2018 002/2023".
dc.format.extent.es.fl_str_mv 2 p.
dc.format.mimetype.es.fl_str_mv application/pdf
dc.identifier.citation.es.fl_str_mv Corengia, M., Acosta, P., Rojas, L. y otros. Integration of P2X process to grid: needs for plant models for a smooth transition [en línea] EN: 1st International Symposium on Energy System Analysis (ISESA) “Next level of security of supply: a resilience strategy for the energy transition” Stuttgart, Alemania, 11 - 12 nov. 2024. 2 p.
dc.identifier.uri.none.fl_str_mv https://hdl.handle.net/20.500.12008/53360
dc.language.iso.none.fl_str_mv en
eng
dc.relation.none.fl_str_mv 1st International Symposium on Energy System Analysis (ISESA) “Next level of security of supply: a resilience strategy for the energy transition” Stuttgart, Alemania, 11 - 12 nov. 2024.
dc.rights.license.none.fl_str_mv Licencia Creative Commons Atribución - No Comercial - Sin Derivadas (CC - By-NC-ND 4.0)
dc.rights.none.fl_str_mv info:eu-repo/semantics/openAccess
dc.source.none.fl_str_mv reponame:COLIBRI
instname:Universidad de la República
instacron:Universidad de la República
dc.title.none.fl_str_mv Integration of P2X process to grid: needs for plant models for a smooth transition
dc.type.es.fl_str_mv Ponencia
dc.type.none.fl_str_mv info:eu-repo/semantics/conferenceObject
dc.type.version.none.fl_str_mv info:eu-repo/semantics/publishedVersion
description The installation of big scale projects to produce decarbonized materials such as green ammonia, green methanol or e-fuels require the incorporation of large amounts of renewable energy. If these new energy sources have variable and non-programmable availability patterns (such as wind energy or solar irradiation), the production facilities will have to cope with additional costs. These costs may involve the installation of energy storage (like batteries), installation of storage for intermediate products (for instance, hydrogen), and faster degradation due to unsteady operation and/or idle installed capacity. The relative impact of these costs will rely on whether the strategy is to prioritize the operation of the process at its designed-capacity (through strategies like energy storage or grid support), or to prioritize flexible operation by utilizing the resources when they are available (which implies non-steady operation). Relying on the electric grid to provide part of the energy supply has other implications. On the one hand, CO2 emissions of the final product will depend on the emissions associated to the production of energy. On the other hand, the required energy may or not be available from the grid. This last point is of particular interest in cases where the projected facilities imply big loads in comparison to the electric grid. For example, in Uruguay current electric power production capacity is 5.3 GW (24% from fossil fuels), and some of the announced projects imply 2 and 3 GW of new generation capacity. In this talk, we will go through the analysis of two examples of Power-to-X (P2X) processes: ammonia and methanol production. Based on case studies from "conventional” (not green) processes, and the available data on electrolyzer systems, the technical flexibility of each P2X process and its subsystems can be obtained. Then, relevant information can be obtained for different scenarios: the amount of energy that should be available from the grid in a scenario of plants connected to the grid, or the requirement of storage options for an isolated plant. These analyses, based on the models of the chemical plants, are required to understand the costs associated with the usage of variable energy sources, and its implications in the tradeoffs when balancing the reduction of CO2 emissions and the final production costs of green ammonia or methanol.
eu_rights_str_mv openAccess
format conferenceObject
id COLIBRI_b6886f0aa6730e8923bf8090940b2942
identifier_str_mv Corengia, M., Acosta, P., Rojas, L. y otros. Integration of P2X process to grid: needs for plant models for a smooth transition [en línea] EN: 1st International Symposium on Energy System Analysis (ISESA) “Next level of security of supply: a resilience strategy for the energy transition” Stuttgart, Alemania, 11 - 12 nov. 2024. 2 p.
instacron_str Universidad de la República
institution Universidad de la República
instname_str Universidad de la República
language eng
language_invalid_str_mv en
network_acronym_str COLIBRI
network_name_str COLIBRI
oai_identifier_str oai:colibri.udelar.edu.uy:20.500.12008/53360
publishDate 2024
reponame_str COLIBRI
repository.mail.fl_str_mv karina.camps@seciu.edu.uy
repository.name.fl_str_mv COLIBRI - Universidad de la República
repository_id_str 4771
rights_invalid_str_mv Licencia Creative Commons Atribución - No Comercial - Sin Derivadas (CC - By-NC-ND 4.0)
spelling Corengia Mariana, Universidad de la República (Uruguay). Facultad de Ingeniería.Acosta Pablo, Universidad de la República (Uruguay). Facultad de Ingeniería.Rojas Leonardo, Universidad de la República (Uruguay). Facultad de Ingeniería.Villanueva Juan Pablo, Universidad de la República (Uruguay). Facultad de Ingeniería.Ohanian Mauricio, Universidad de la República (Uruguay). Facultad de Ingeniería.2026-02-04T20:29:06Z2026-02-04T20:29:06Z2024Corengia, M., Acosta, P., Rojas, L. y otros. Integration of P2X process to grid: needs for plant models for a smooth transition [en línea] EN: 1st International Symposium on Energy System Analysis (ISESA) “Next level of security of supply: a resilience strategy for the energy transition” Stuttgart, Alemania, 11 - 12 nov. 2024. 2 p.https://hdl.handle.net/20.500.12008/53360The installation of big scale projects to produce decarbonized materials such as green ammonia, green methanol or e-fuels require the incorporation of large amounts of renewable energy. If these new energy sources have variable and non-programmable availability patterns (such as wind energy or solar irradiation), the production facilities will have to cope with additional costs. These costs may involve the installation of energy storage (like batteries), installation of storage for intermediate products (for instance, hydrogen), and faster degradation due to unsteady operation and/or idle installed capacity. The relative impact of these costs will rely on whether the strategy is to prioritize the operation of the process at its designed-capacity (through strategies like energy storage or grid support), or to prioritize flexible operation by utilizing the resources when they are available (which implies non-steady operation). Relying on the electric grid to provide part of the energy supply has other implications. On the one hand, CO2 emissions of the final product will depend on the emissions associated to the production of energy. On the other hand, the required energy may or not be available from the grid. This last point is of particular interest in cases where the projected facilities imply big loads in comparison to the electric grid. For example, in Uruguay current electric power production capacity is 5.3 GW (24% from fossil fuels), and some of the announced projects imply 2 and 3 GW of new generation capacity. In this talk, we will go through the analysis of two examples of Power-to-X (P2X) processes: ammonia and methanol production. Based on case studies from "conventional” (not green) processes, and the available data on electrolyzer systems, the technical flexibility of each P2X process and its subsystems can be obtained. Then, relevant information can be obtained for different scenarios: the amount of energy that should be available from the grid in a scenario of plants connected to the grid, or the requirement of storage options for an isolated plant. These analyses, based on the models of the chemical plants, are required to understand the costs associated with the usage of variable energy sources, and its implications in the tradeoffs when balancing the reduction of CO2 emissions and the final production costs of green ammonia or methanol.Submitted by Machado Jimena (jmachado@fing.edu.uy) on 2026-02-04T19:45:54Z No. of bitstreams: 2 license_rdf: 27293 bytes, checksum: d62648cf14c1e37917d392ac87012955 (MD5) CARVO24.pdf: 141252 bytes, checksum: 89768fc4f1a62aedc2fef6d02fa40bb6 (MD5)Approved for entry into archive by Machado Jimena (jmachado@fing.edu.uy) on 2026-02-04T19:56:47Z (GMT) No. of bitstreams: 2 license_rdf: 27293 bytes, checksum: d62648cf14c1e37917d392ac87012955 (MD5) CARVO24.pdf: 141252 bytes, checksum: 89768fc4f1a62aedc2fef6d02fa40bb6 (MD5)Made available in DSpace by Camps Karina (karina.camps@seciu.edu.uy) on 2026-02-04T20:29:06Z (GMT). No. of bitstreams: 2 license_rdf: 27293 bytes, checksum: d62648cf14c1e37917d392ac87012955 (MD5) CARVO24.pdf: 141252 bytes, checksum: 89768fc4f1a62aedc2fef6d02fa40bb6 (MD5) Previous issue date: 2024Proyecto ANII MOV_CO_HV_1_2023_1_176875 y Convenio entre UTE y la Fundación Julio Ricaldoni "PROPUESTA TÉCNICA UTE 2018 002/2023".2 p.application/pdfeneng1st International Symposium on Energy System Analysis (ISESA) “Next level of security of supply: a resilience strategy for the energy transition” Stuttgart, Alemania, 11 - 12 nov. 2024.Las obras depositadas en el Repositorio se rigen por la Ordenanza de los Derechos de la Propiedad Intelectual de la Universidad de la República.(Res. Nº 91 de C.D.C. de 8/III/1994 – D.O. 7/IV/1994) y por la Ordenanza del Repositorio Abierto de la Universidad de la República (Res. Nº 16 de C.D.C. de 07/10/2014)info:eu-repo/semantics/openAccessLicencia Creative Commons Atribución - No Comercial - Sin Derivadas (CC - By-NC-ND 4.0)Integration of P2X process to grid: needs for plant models for a smooth transitionPonenciainfo:eu-repo/semantics/conferenceObjectinfo:eu-repo/semantics/publishedVersionreponame:COLIBRIinstname:Universidad de la Repúblicainstacron:Universidad de la RepúblicaCorengia, MarianaAcosta, PabloRojas, LeonardoVillanueva, Juan PabloOhanian, MauricioLICENSElicense.txtlicense.txttext/plain; charset=utf-84267http://localhost:8080/xmlui/bitstream/20.500.12008/53360/5/license.txt6429389a7df7277b72b7924fdc7d47a9MD55CC-LICENSElicense_urllicense_urltext/plain; charset=utf-850http://localhost:8080/xmlui/bitstream/20.500.12008/53360/2/license_urla006180e3f5b2ad0b88185d14284c0e0MD52license_textlicense_texttext/html; charset=utf-838500http://localhost:8080/xmlui/bitstream/20.500.12008/53360/3/license_texta73ca8d13adf70b0d75335af21cfc665MD53license_rdflicense_rdfapplication/rdf+xml; charset=utf-827293http://localhost:8080/xmlui/bitstream/20.500.12008/53360/4/license_rdfd62648cf14c1e37917d392ac87012955MD54ORIGINALCARVO24.pdfCARVO24.pdfapplication/pdf141252http://localhost:8080/xmlui/bitstream/20.500.12008/53360/1/CARVO24.pdf89768fc4f1a62aedc2fef6d02fa40bb6MD5120.500.12008/533602026-02-04 17:29:06.599oai:colibri.udelar.edu.uy:20.500.12008/53360VGVybWlub3MgeSBjb25kaWNpb25lcyByZWxhdGl2YXMgYWwgZGVwb3NpdG8gZGUgb2JyYXMKCgpMYXMgb2JyYXMgZGVwb3NpdGFkYXMgZW4gZWwgUmVwb3NpdG9yaW8gc2UgcmlnZW4gcG9yIGxhIE9yZGVuYW56YSBkZSBsb3MgRGVyZWNob3MgZGUgbGEgUHJvcGllZGFkIEludGVsZWN0dWFsICBkZSBsYSBVbml2ZXJzaWRhZCBEZSBMYSBSZXDDumJsaWNhLiAoUmVzLiBOwrogOTEgZGUgQy5ELkMuIGRlIDgvSUlJLzE5OTQg4oCTIEQuTy4gNy9JVi8xOTk0KSB5ICBwb3IgbGEgT3JkZW5hbnphIGRlbCBSZXBvc2l0b3JpbyBBYmllcnRvIGRlIGxhIFVuaXZlcnNpZGFkIGRlIGxhIFJlcMO6YmxpY2EgKFJlcy4gTsK6IDE2IGRlIEMuRC5DLiBkZSAwNy8xMC8yMDE0KS4gCgpBY2VwdGFuZG8gZWwgYXV0b3IgZXN0b3MgdMOpcm1pbm9zIHkgY29uZGljaW9uZXMgZGUgZGVww7NzaXRvIGVuIENPTElCUkksIGxhIFVuaXZlcnNpZGFkIGRlIFJlcMO6YmxpY2EgcHJvY2VkZXLDoSBhOiAgCgphKSBhcmNoaXZhciBtw6FzIGRlIHVuYSBjb3BpYSBkZSBsYSBvYnJhIGVuIGxvcyBzZXJ2aWRvcmVzIGRlIGxhIFVuaXZlcnNpZGFkIGEgbG9zIGVmZWN0b3MgZGUgZ2FyYW50aXphciBhY2Nlc28sIHNlZ3VyaWRhZCB5IHByZXNlcnZhY2nDs24KYikgY29udmVydGlyIGxhIG9icmEgYSBvdHJvcyBmb3JtYXRvcyBzaSBmdWVyYSBuZWNlc2FyaW8gIHBhcmEgZmFjaWxpdGFyIHN1IHByZXNlcnZhY2nDs24geSBhY2Nlc2liaWxpZGFkIHNpbiBhbHRlcmFyIHN1IGNvbnRlbmlkby4KYykgcmVhbGl6YXIgbGEgY29tdW5pY2FjacOzbiBww7pibGljYSB5IGRpc3BvbmVyIGVsIGFjY2VzbyBsaWJyZSB5IGdyYXR1aXRvIGEgdHJhdsOpcyBkZSBJbnRlcm5ldCBtZWRpYW50ZSBsYSBwdWJsaWNhY2nDs24gZGUgbGEgb2JyYSBiYWpvIGxhIGxpY2VuY2lhIENyZWF0aXZlIENvbW1vbnMgc2VsZWNjaW9uYWRhIHBvciBlbCBwcm9waW8gYXV0b3IuCgoKRW4gY2FzbyBxdWUgZWwgYXV0b3IgaGF5YSBkaWZ1bmRpZG8geSBkYWRvIGEgcHVibGljaWRhZCBhIGxhIG9icmEgZW4gZm9ybWEgcHJldmlhLCAgcG9kcsOhIHNvbGljaXRhciB1biBwZXLDrW9kbyBkZSBlbWJhcmdvIHNvYnJlIGxhIGRpc3BvbmliaWxpZGFkIHDDumJsaWNhIGRlIGxhIG1pc21hLCBlbCBjdWFsIGNvbWVuemFyw6EgYSBwYXJ0aXIgZGUgbGEgYWNlcHRhY2nDs24gZGUgZXN0ZSBkb2N1bWVudG8geSBoYXN0YSBsYSBmZWNoYSBxdWUgaW5kaXF1ZSAuCgpFbCBhdXRvciBhc2VndXJhIHF1ZSBsYSBvYnJhIG5vIGluZnJpZ2UgbmluZ8O6biBkZXJlY2hvIHNvYnJlIHRlcmNlcm9zLCB5YSBzZWEgZGUgcHJvcGllZGFkIGludGVsZWN0dWFsIG8gY3VhbHF1aWVyIG90cm8uCgpFbCBhdXRvciBnYXJhbnRpemEgcXVlIHNpIGVsIGRvY3VtZW50byBjb250aWVuZSBtYXRlcmlhbGVzIGRlIGxvcyBjdWFsZXMgbm8gdGllbmUgbG9zIGRlcmVjaG9zIGRlIGF1dG9yLCAgaGEgb2J0ZW5pZG8gZWwgcGVybWlzbyBkZWwgcHJvcGlldGFyaW8gZGUgbG9zIGRlcmVjaG9zIGRlIGF1dG9yLCB5IHF1ZSBlc2UgbWF0ZXJpYWwgY3V5b3MgZGVyZWNob3Mgc29uIGRlIHRlcmNlcm9zIGVzdMOhIGNsYXJhbWVudGUgaWRlbnRpZmljYWRvIHkgcmVjb25vY2lkbyBlbiBlbCB0ZXh0byBvIGNvbnRlbmlkbyBkZWwgZG9jdW1lbnRvIGRlcG9zaXRhZG8gZW4gZWwgUmVwb3NpdG9yaW8uCgpFbiBvYnJhcyBkZSBhdXRvcsOtYSBtw7psdGlwbGUgL3NlIHByZXN1bWUvIHF1ZSBlbCBhdXRvciBkZXBvc2l0YW50ZSBkZWNsYXJhIHF1ZSBoYSByZWNhYmFkbyBlbCBjb25zZW50aW1pZW50byBkZSB0b2RvcyBsb3MgYXV0b3JlcyBwYXJhIHB1YmxpY2FybGEgZW4gZWwgUmVwb3NpdG9yaW8sIHNpZW5kbyDDqXN0ZSBlbCDDum5pY28gcmVzcG9uc2FibGUgZnJlbnRlIGEgY3VhbHF1aWVyIHRpcG8gZGUgcmVjbGFtYWNpw7NuIGRlIGxvcyBvdHJvcyBjb2F1dG9yZXMuCgpFbCBhdXRvciBzZXLDoSByZXNwb25zYWJsZSBkZWwgY29udGVuaWRvIGRlIGxvcyBkb2N1bWVudG9zIHF1ZSBkZXBvc2l0YS4gTGEgVURFTEFSIG5vIHNlcsOhIHJlc3BvbnNhYmxlIHBvciBsYXMgZXZlbnR1YWxlcyB2aW9sYWNpb25lcyBhbCBkZXJlY2hvIGRlIHByb3BpZWRhZCBpbnRlbGVjdHVhbCBlbiBxdWUgcHVlZGEgaW5jdXJyaXIgZWwgYXV0b3IuCgpBbnRlIGN1YWxxdWllciBkZW51bmNpYSBkZSB2aW9sYWNpw7NuIGRlIGRlcmVjaG9zIGRlIHByb3BpZWRhZCBpbnRlbGVjdHVhbCwgbGEgVURFTEFSICBhZG9wdGFyw6EgdG9kYXMgbGFzIG1lZGlkYXMgbmVjZXNhcmlhcyBwYXJhIGV2aXRhciBsYSBjb250aW51YWNpw7NuIGRlIGRpY2hhIGluZnJhY2Npw7NuLCBsYXMgcXVlIHBvZHLDoW4gaW5jbHVpciBlbCByZXRpcm8gZGVsIGFjY2VzbyBhIGxvcyBjb250ZW5pZG9zIHkvbyBtZXRhZGF0b3MgZGVsIGRvY3VtZW50byByZXNwZWN0aXZvLgoKTGEgb2JyYSBzZSBwb25kcsOhIGEgZGlzcG9zaWNpw7NuIGRlbCBww7pibGljbyBhIHRyYXbDqXMgZGUgbGFzIGxpY2VuY2lhcyBDcmVhdGl2ZSBDb21tb25zLCBlbCBhdXRvciBwb2Ryw6Egc2VsZWNjaW9uYXIgdW5hIGRlIGxhcyA2IGxpY2VuY2lhcyBkaXNwb25pYmxlczoKCgpBdHJpYnVjacOzbiAoQ0MgLSBCeSk6IFBlcm1pdGUgdXNhciBsYSBvYnJhIHkgZ2VuZXJhciBvYnJhcyBkZXJpdmFkYXMsIGluY2x1c28gY29uIGZpbmVzIGNvbWVyY2lhbGVzLCBzaWVtcHJlIHF1ZSBzZSByZWNvbm96Y2EgYWwgYXV0b3IuCgpBdHJpYnVjacOzbiDigJMgQ29tcGFydGlyIElndWFsIChDQyAtIEJ5LVNBKTogUGVybWl0ZSB1c2FyIGxhIG9icmEgeSBnZW5lcmFyIG9icmFzIGRlcml2YWRhcywgaW5jbHVzbyBjb24gZmluZXMgY29tZXJjaWFsZXMsIHBlcm8gbGEgZGlzdHJpYnVjacOzbiBkZSBsYXMgb2JyYXMgZGVyaXZhZGFzIGRlYmUgaGFjZXJzZSBtZWRpYW50ZSB1bmEgbGljZW5jaWEgaWTDqW50aWNhIGEgbGEgZGUgbGEgb2JyYSBvcmlnaW5hbCwgcmVjb25vY2llbmRvIGEgbG9zIGF1dG9yZXMuCgpBdHJpYnVjacOzbiDigJMgTm8gQ29tZXJjaWFsIChDQyAtIEJ5LU5DKTogUGVybWl0ZSB1c2FyIGxhIG9icmEgeSBnZW5lcmFyIG9icmFzIGRlcml2YWRhcywgc2llbXByZSB5IGN1YW5kbyBlc29zIHVzb3Mgbm8gdGVuZ2FuIGZpbmVzIGNvbWVyY2lhbGVzLCByZWNvbm9jaWVuZG8gYWwgYXV0b3IuCgpBdHJpYnVjacOzbiDigJMgU2luIERlcml2YWRhcyAoQ0MgLSBCeS1ORCk6IFBlcm1pdGUgZWwgdXNvIGRlIGxhIG9icmEsIGluY2x1c28gY29uIGZpbmVzIGNvbWVyY2lhbGVzLCBwZXJvIG5vIHNlIHBlcm1pdGUgZ2VuZXJhciBvYnJhcyBkZXJpdmFkYXMsIGRlYmllbmRvIHJlY29ub2NlciBhbCBhdXRvci4KCkF0cmlidWNpw7NuIOKAkyBObyBDb21lcmNpYWwg4oCTIENvbXBhcnRpciBJZ3VhbCAoQ0Mg4oCTIEJ5LU5DLVNBKTogUGVybWl0ZSB1c2FyIGxhIG9icmEgeSBnZW5lcmFyIG9icmFzIGRlcml2YWRhcywgc2llbXByZSB5IGN1YW5kbyBlc29zIHVzb3Mgbm8gdGVuZ2FuIGZpbmVzIGNvbWVyY2lhbGVzIHkgbGEgZGlzdHJpYnVjacOzbiBkZSBsYXMgb2JyYXMgZGVyaXZhZGFzIHNlIGhhZ2EgbWVkaWFudGUgbGljZW5jaWEgaWTDqW50aWNhIGEgbGEgZGUgbGEgb2JyYSBvcmlnaW5hbCwgcmVjb25vY2llbmRvIGEgbG9zIGF1dG9yZXMuCgpBdHJpYnVjacOzbiDigJMgTm8gQ29tZXJjaWFsIOKAkyBTaW4gRGVyaXZhZGFzIChDQyAtIEJ5LU5DLU5EKTogUGVybWl0ZSB1c2FyIGxhIG9icmEsIHBlcm8gbm8gc2UgcGVybWl0ZSBnZW5lcmFyIG9icmFzIGRlcml2YWRhcyB5IG5vIHNlIHBlcm1pdGUgdXNvIGNvbiBmaW5lcyBjb21lcmNpYWxlcywgZGViaWVuZG8gcmVjb25vY2VyIGFsIGF1dG9yLgoKTG9zIHVzb3MgcHJldmlzdG9zIGVuIGxhcyBsaWNlbmNpYXMgaW5jbHV5ZW4gbGEgZW5hamVuYWNpw7NuLCByZXByb2R1Y2Npw7NuLCBjb211bmljYWNpw7NuLCBwdWJsaWNhY2nDs24sIGRpc3RyaWJ1Y2nDs24geSBwdWVzdGEgYSBkaXNwb3NpY2nDs24gZGVsIHDDumJsaWNvLiBMYSBjcmVhY2nDs24gZGUgb2JyYXMgZGVyaXZhZGFzIGluY2x1eWUgbGEgYWRhcHRhY2nDs24sIHRyYWR1Y2Npw7NuIHkgZWwgcmVtaXguCgpDdWFuZG8gc2Ugc2VsZWNjaW9uZSB1bmEgbGljZW5jaWEgcXVlIGhhYmlsaXRlIHVzb3MgY29tZXJjaWFsZXMsIGVsIGRlcMOzc2l0byBkZWJlcsOhIHNlciBhY29tcGHDsWFkbyBkZWwgYXZhbCBkZWwgamVyYXJjYSBtw6F4aW1vIGRlbCBTZXJ2aWNpbyBjb3JyZXNwb25kaWVudGUuCg==Institucionalhttps://www.colibri.udelar.edu.uyUniversidad públicahttps://udelar.edu.uy/https://www.colibri.udelar.edu.uy/oai/requestkarina.camps@seciu.edu.uyUruguayopendoar:47712026-02-04T20:29:06COLIBRI - Universidad de la Repúblicafalse
spellingShingle Integration of P2X process to grid: needs for plant models for a smooth transition
Corengia, Mariana
status_str publishedVersion
title Integration of P2X process to grid: needs for plant models for a smooth transition
title_full Integration of P2X process to grid: needs for plant models for a smooth transition
title_fullStr Integration of P2X process to grid: needs for plant models for a smooth transition
title_full_unstemmed Integration of P2X process to grid: needs for plant models for a smooth transition
title_short Integration of P2X process to grid: needs for plant models for a smooth transition
title_sort Integration of P2X process to grid: needs for plant models for a smooth transition
url https://hdl.handle.net/20.500.12008/53360