Distributed generation and demand response effects on the distribution network planning
Resumen:
This paper studies the possible benefits/overcharges for a Distribution Network Operator (DNO) in the process of Planning the Distribution Network, when Distributed Generation (DG), and/or Demand Response (DR) policies are incorporated in the Distribution network. The results obtained for the design of the new grid with this participation are incorporated into the network planning process with different types of DG power plants and DR in their demand nodes, compared with the base case of demand obtained in the case of a network without changes in their consumption patterns neither DG incorporation. For the planning process of the new network in either cases, the classic Distribution Network Planning methodology was used, which is based on the classic economic theory of Minimum Total Cost (MTC) through which the Investment Plan of the Distribution Network of the Electrical Distribution Company is drawn up. The solutions obtained guarantee the supply of the power and energy demand of its customers at all times (all scenarios), minimizing the total cost equation and complying with the physical design constraints during the network planning horizon of 20 years. A genetic algorithm (GA) was used to search for the optimal solution (minim total cost) in a technical-economic point of view of the electricity network. Keywords—Distribution Network Planning, Distributed Generation, Demand Response, Technical Losses, Economic Evaluation.
2018 | |
Distribution network planning Distributed generation Demand response Technical losses Economic evaluation Potencia |
|
Inglés | |
Universidad de la República | |
COLIBRI | |
https://hdl.handle.net/20.500.12008/43554 | |
Acceso abierto | |
Licencia Creative Commons Atribución - No Comercial - Sin Derivadas (CC - By-NC-ND 4.0) |
_version_ | 1807522942479761408 |
---|---|
author | Rey, Marcelo |
author2 | Montes de Oca, Sebastián Giusto, Alvaro Vignolo, Mario |
author2_role | author author author |
author_facet | Rey, Marcelo Montes de Oca, Sebastián Giusto, Alvaro Vignolo, Mario |
author_role | author |
bitstream.checksum.fl_str_mv | 528b6a3c8c7d0c6e28129d576e989607 9833653f73f7853880c94a6fead477b1 4afdbb8c545fd630ea7db775da747b2f 9da0b6dfac957114c6a7714714b86306 418215b1b0b4cd102c3b111d97946728 |
bitstream.checksumAlgorithm.fl_str_mv | MD5 MD5 MD5 MD5 MD5 |
bitstream.url.fl_str_mv | http://localhost:8080/xmlui/bitstream/20.500.12008/43554/5/license.txt http://localhost:8080/xmlui/bitstream/20.500.12008/43554/2/license_text http://localhost:8080/xmlui/bitstream/20.500.12008/43554/3/license_url http://localhost:8080/xmlui/bitstream/20.500.12008/43554/4/license_rdf http://localhost:8080/xmlui/bitstream/20.500.12008/43554/1/RMGV18.pdf |
collection | COLIBRI |
dc.creator.none.fl_str_mv | Rey, Marcelo Montes de Oca, Sebastián Giusto, Alvaro Vignolo, Mario |
dc.date.accessioned.none.fl_str_mv | 2024-04-16T16:21:30Z |
dc.date.available.none.fl_str_mv | 2024-04-16T16:21:30Z |
dc.date.issued.es.fl_str_mv | 2018 |
dc.date.submitted.es.fl_str_mv | 20240416 |
dc.description.abstract.none.fl_txt_mv | This paper studies the possible benefits/overcharges for a Distribution Network Operator (DNO) in the process of Planning the Distribution Network, when Distributed Generation (DG), and/or Demand Response (DR) policies are incorporated in the Distribution network. The results obtained for the design of the new grid with this participation are incorporated into the network planning process with different types of DG power plants and DR in their demand nodes, compared with the base case of demand obtained in the case of a network without changes in their consumption patterns neither DG incorporation. For the planning process of the new network in either cases, the classic Distribution Network Planning methodology was used, which is based on the classic economic theory of Minimum Total Cost (MTC) through which the Investment Plan of the Distribution Network of the Electrical Distribution Company is drawn up. The solutions obtained guarantee the supply of the power and energy demand of its customers at all times (all scenarios), minimizing the total cost equation and complying with the physical design constraints during the network planning horizon of 20 years. A genetic algorithm (GA) was used to search for the optimal solution (minim total cost) in a technical-economic point of view of the electricity network. Keywords—Distribution Network Planning, Distributed Generation, Demand Response, Technical Losses, Economic Evaluation. |
dc.description.es.fl_txt_mv | Trabajo presentado a EEE PES Transmission Distribution Conference and Exhibition, Latin America (T D-LA), Lima, Perú,18-21 set., 2018. |
dc.identifier.citation.es.fl_str_mv | Rey, M, Montes de Oca, S, Giusto, A, Vignolo, M. "Distributed generation and demand response effects on the distribution network planning" Publicado en: Proceedings of the IEEE PES Transmission Distribution Conference and Exhibition - Latin America (T D-LA), Lima, Peru, 18-21 set., 2018, pp. 1-5, doi: 10.1109/TDC-LA.2018.8511660. |
dc.identifier.uri.none.fl_str_mv | https://hdl.handle.net/20.500.12008/43554 |
dc.language.iso.none.fl_str_mv | en eng |
dc.rights.license.none.fl_str_mv | Licencia Creative Commons Atribución - No Comercial - Sin Derivadas (CC - By-NC-ND 4.0) |
dc.rights.none.fl_str_mv | info:eu-repo/semantics/openAccess |
dc.source.none.fl_str_mv | reponame:COLIBRI instname:Universidad de la República instacron:Universidad de la República |
dc.subject.es.fl_str_mv | Distribution network planning Distributed generation Demand response Technical losses Economic evaluation |
dc.subject.other.es.fl_str_mv | Potencia |
dc.title.none.fl_str_mv | Distributed generation and demand response effects on the distribution network planning |
dc.type.es.fl_str_mv | Ponencia |
dc.type.none.fl_str_mv | info:eu-repo/semantics/conferenceObject |
dc.type.version.none.fl_str_mv | info:eu-repo/semantics/publishedVersion |
description | Trabajo presentado a EEE PES Transmission |
eu_rights_str_mv | openAccess |
format | conferenceObject |
id | COLIBRI_a4d622ed9b6091d65d1669be47cf59ee |
identifier_str_mv | Rey, M, Montes de Oca, S, Giusto, A, Vignolo, M. "Distributed generation and demand response effects on the distribution network planning" Publicado en: Proceedings of the IEEE PES Transmission Distribution Conference and Exhibition - Latin America (T D-LA), Lima, Peru, 18-21 set., 2018, pp. 1-5, doi: 10.1109/TDC-LA.2018.8511660. |
instacron_str | Universidad de la República |
institution | Universidad de la República |
instname_str | Universidad de la República |
language | eng |
language_invalid_str_mv | en |
network_acronym_str | COLIBRI |
network_name_str | COLIBRI |
oai_identifier_str | oai:colibri.udelar.edu.uy:20.500.12008/43554 |
publishDate | 2018 |
reponame_str | COLIBRI |
repository.mail.fl_str_mv | mabel.seroubian@seciu.edu.uy |
repository.name.fl_str_mv | COLIBRI - Universidad de la República |
repository_id_str | 4771 |
rights_invalid_str_mv | Licencia Creative Commons Atribución - No Comercial - Sin Derivadas (CC - By-NC-ND 4.0) |
spelling | 2024-04-16T16:21:30Z2024-04-16T16:21:30Z201820240416Rey, M, Montes de Oca, S, Giusto, A, Vignolo, M. "Distributed generation and demand response effects on the distribution network planning" Publicado en: Proceedings of the IEEE PES TransmissionDistribution Conference and Exhibition - Latin America (TD-LA), Lima, Peru, 18-21 set., 2018, pp. 1-5, doi: 10.1109/TDC-LA.2018.8511660.https://hdl.handle.net/20.500.12008/43554Trabajo presentado a EEE PES TransmissionDistribution Conference and Exhibition, Latin America (TD-LA), Lima, Perú,18-21 set., 2018.This paper studies the possible benefits/overcharges for a Distribution Network Operator (DNO) in the process of Planning the Distribution Network, when Distributed Generation (DG), and/or Demand Response (DR) policies are incorporated in the Distribution network. The results obtained for the design of the new grid with this participation are incorporated into the network planning process with different types of DG power plants and DR in their demand nodes, compared with the base case of demand obtained in the case of a network without changes in their consumption patterns neither DG incorporation. For the planning process of the new network in either cases, the classic Distribution Network Planning methodology was used, which is based on the classic economic theory of Minimum Total Cost (MTC) through which the Investment Plan of the Distribution Network of the Electrical Distribution Company is drawn up. The solutions obtained guarantee the supply of the power and energy demand of its customers at all times (all scenarios), minimizing the total cost equation and complying with the physical design constraints during the network planning horizon of 20 years. A genetic algorithm (GA) was used to search for the optimal solution (minim total cost) in a technical-economic point of view of the electricity network. Keywords—Distribution Network Planning, Distributed Generation, Demand Response, Technical Losses, Economic Evaluation.Made available in DSpace on 2024-04-16T16:21:30Z (GMT). No. of bitstreams: 5 RMGV18.pdf: 654470 bytes, checksum: 418215b1b0b4cd102c3b111d97946728 (MD5) license_text: 21936 bytes, checksum: 9833653f73f7853880c94a6fead477b1 (MD5) license_url: 49 bytes, checksum: 4afdbb8c545fd630ea7db775da747b2f (MD5) license_rdf: 23148 bytes, checksum: 9da0b6dfac957114c6a7714714b86306 (MD5) license.txt: 4244 bytes, checksum: 528b6a3c8c7d0c6e28129d576e989607 (MD5) Previous issue date: 2018enengLas obras depositadas en el Repositorio se rigen por la Ordenanza de los Derechos de la Propiedad Intelectual de la Universidad De La República. (Res. Nº 91 de C.D.C. de 8/III/1994 – D.O. 7/IV/1994) y por la Ordenanza del Repositorio Abierto de la Universidad de la República (Res. Nº 16 de C.D.C. de 07/10/2014)info:eu-repo/semantics/openAccessLicencia Creative Commons Atribución - No Comercial - Sin Derivadas (CC - By-NC-ND 4.0)Distribution network planningDistributed generationDemand responseTechnical lossesEconomic evaluationPotenciaDistributed generation and demand response effects on the distribution network planningPonenciainfo:eu-repo/semantics/conferenceObjectinfo:eu-repo/semantics/publishedVersionreponame:COLIBRIinstname:Universidad de la Repúblicainstacron:Universidad de la RepúblicaRey, MarceloMontes de Oca, SebastiánGiusto, AlvaroVignolo, MarioLICENSElicense.txttext/plain4244http://localhost:8080/xmlui/bitstream/20.500.12008/43554/5/license.txt528b6a3c8c7d0c6e28129d576e989607MD55CC-LICENSElicense_textapplication/octet-stream21936http://localhost:8080/xmlui/bitstream/20.500.12008/43554/2/license_text9833653f73f7853880c94a6fead477b1MD52license_urlapplication/octet-stream49http://localhost:8080/xmlui/bitstream/20.500.12008/43554/3/license_url4afdbb8c545fd630ea7db775da747b2fMD53license_rdfapplication/octet-stream23148http://localhost:8080/xmlui/bitstream/20.500.12008/43554/4/license_rdf9da0b6dfac957114c6a7714714b86306MD54ORIGINALRMGV18.pdfapplication/pdf654470http://localhost:8080/xmlui/bitstream/20.500.12008/43554/1/RMGV18.pdf418215b1b0b4cd102c3b111d97946728MD5120.500.12008/435542024-04-16 13:21:30.665oai:colibri.udelar.edu.uy:20.500.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Universidadhttps://udelar.edu.uy/https://www.colibri.udelar.edu.uy/oai/requestmabel.seroubian@seciu.edu.uyUruguayopendoar:47712024-07-25T14:33:51.920644COLIBRI - Universidad de la Repúblicafalse |
spellingShingle | Distributed generation and demand response effects on the distribution network planning Rey, Marcelo Distribution network planning Distributed generation Demand response Technical losses Economic evaluation Potencia |
status_str | publishedVersion |
title | Distributed generation and demand response effects on the distribution network planning |
title_full | Distributed generation and demand response effects on the distribution network planning |
title_fullStr | Distributed generation and demand response effects on the distribution network planning |
title_full_unstemmed | Distributed generation and demand response effects on the distribution network planning |
title_short | Distributed generation and demand response effects on the distribution network planning |
title_sort | Distributed generation and demand response effects on the distribution network planning |
topic | Distribution network planning Distributed generation Demand response Technical losses Economic evaluation Potencia |
url | https://hdl.handle.net/20.500.12008/43554 |